My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />CITY OF SUNNY ISLES BEACH SECTION 03200 - 3 <br />WELL CASING <br /> <br />PART 3 - EXECUTION <br /> <br />3.1 GENERAL <br /> <br />A. Casing liner shall be installed as described in the specifications and drawings. Actual <br />casing liner depths will be determined by the depth of the existing 24” steel casing and <br />confirmed by the ENGINEER. <br /> <br />B. The casing liner installation method shall be approved in advance by the ENGINEER <br />and shall be consistent with manufacturer specifications. <br /> <br />C. Casing liner failure by any means, including but not limited to: collapse, breakage, <br />separation, dents, tears or rips during construction, that in any way impair the use of the <br />well or future use/condition of casing material in the opinion of the ENGINEER, shall be <br />repaired or replaced at the CONTRACTOR'S sole expense. <br /> <br />D. Casing liner connections shall meet manufacturer specifications for water tightness. <br />Connections shall have equal strength as the casing itself. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.