My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 03400 - 3 <br />CEMENT GROUT <br /> <br /> <br />G. The grout mixture for the initial grouting stage after each casing liner installation shall <br />be API Class B neat Portland cement mixed with no more than 6 gallons of water per <br />sack of cement. At a minimum, the neat cement mixture shall be used to grout the <br />lower 50 linear feet of casing. Additional grouting stages after casing installation above <br />the initial grouting stage will be API Class B Portland cement mixed with up to 6% <br />bentonite and no more than 9 gallons of water per sack of cement. Only potable water <br />shall be used for the grout mix. <br /> <br />3.2 SETTING TIME <br /> <br />A. Each cement stage should be allowed to set for at least 12 hours and its level <br />measured before proceeding with the next stage. <br /> <br />B. Cement will be allowed to cure 48 hours before continuation of drilling operations. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.