My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 03500 - 1 <br />WELL DEVELOPMENT <br /> <br />SECTION 03500 <br /> <br />WELL DEVELOPMENT <br /> <br />PART 1 - GENERAL <br /> <br />1.1 SCOPE OF WORK <br /> <br />A. This section covers the labor, equipment and materials required to perform cleaning of <br />the existing wells and development of the wells to meet the design production rate of <br />600 gpm/ft. head. <br /> <br />B. The CONTRACTOR shall develop the wells using a combination of compressed air and <br />pumped water, until, to the satisfaction of the ENGINEER, the discharge water is free of <br />sediments. The CONTRACTOR shall frequently and regularly surge the wells. <br /> <br />C. Well development activity includes jetting with simultaneous air lift, air lift and pump <br />development. The CONTRACTOR shall be paid per each developed well and shall <br />include but not be limited to the furnishing of all material, labor and equipment <br />necessary to complete development as specified, including all work necessary for the <br />installation and removal of test pump, and work necessary for changing development <br />methods between pumping, airlift, or jetting. <br /> <br />1.2 SUBMITTALS <br /> <br />A. The CONTRACTOR will furnish the ENGINEER with manufacturer specifications for all <br />chemical additives proposed for development, manufacturer specifications for <br />generators, pumps and corresponding silencers, a calibrated flow meter with <br />certification no older than 60 days prior to notice to proceed and attest to an accuracy <br />of 95 percent or greater for the range of the meter, prior to installation of the <br />development pump, a manufacturer pump curve for development and testing pump(s), <br />drawing depicting schematic plan and equipment and piping for formation water <br />disposal. <br /> <br />B. Daily development summary logs must be completed daily by the CONTRACTOR and <br />submitted to the OWNER and ENGINEER as requested. <br /> <br />PART 2 - PRODUCTS <br /> <br />2.1 DEVELOPMENT EQUIPMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.