My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 03500 - 4 <br />WELL DEVELOPMENT <br /> <br />for paying any fines or penalties that may result from his failure to provide adequate <br />treatment facilities. <br /> <br />D. Discharge water shall always be contained and under control by the CONTRACTOR. <br />Any erosion that results from the discharge water shall be immediately repaired by the <br />CONTRACTOR to its previous non-eroded condition. <br /> <br />E. The CONTRACTOR shall employ Best Management Practices (BMPs) to mitigate <br />potential turbidity and/or solids from entering any surface water body receiving <br />discharge water. The CONTRACTOR shall install and maintain silt booms, curtains, or <br />other means required to protect any surface water body receiving the discharge water. <br />Surface water receiving discharge water shall not exceed 29 nephelometric turbidity <br />units (NTU) above background conditions. Where applicable, the CONTRACTOR shall <br />maintain appropriate water quality monitoring records demonstrating compliance with <br />turbidity requirements in the receiving water body <br /> <br />F. The CONTRACTOR shall ensure that the discharge water does not impact adjoining <br />property unless it is specifically approved by the OWNER, does not flood streets or <br />impede any traffic flow in any way, and does not cause a nuisance in general. <br /> <br />G. The CONTRACTOR shall monitor the discharge water disposal system continuously for <br />leaks and possible problem areas. An inspection of the completed pipeline may be <br />conducted frequently by the OWNER or ENGINEER to observe its integrity. Operations <br />must stop until noted deficiencies are corrected. It is, however, the CONTRACTOR’S <br />responsibility to ensure the integrity of the system at all times. <br /> <br />H. The CONTRACTOR shall provide safety measures and controls as needed. <br /> <br /> <br />END OF SECTION <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.