My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH SECTION 03720 - 2 <br />WELL REHABILITATION SEQUENCE <br /> <br />C. The CONTRACTOR shall obtain approval from the OWNER for all 24-hour work <br />excluding weekends and Federal holidays. Requests for 24-hour work shall be <br />submitted as outlined in Section 01300. <br /> <br />D. The CONTRACTOR will be allowed only one (1) well out of service for rehabilitation at <br />a time. The OWNER shall determine the sequence of wells to be rehabilitated based on <br />the needs of the OWNER. The CONTRACTOR, during the activities of rehabilitating <br />each well, shall arrange to temporarily reroute the incoming storm water flows to other <br />nearby drainage systems or outfalls via pumping and temporary piping, as approved by <br />the OWNER and the ENGINEER. <br /> <br />E. A construction sequence plan shall be submitted to the OWNER and ENGINEER for <br />approval prior to commencement of any work. <br /> <br /> <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.