My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. North Bay Road Drainage Improvements 18-04-01 20 <br /> <br /> service quantities and frequencies, as deemed necessary to serve th e best interests of the <br /> City. <br /> <br />2.33 WARRANTY SHALL BE SUPPLIED IN WRITTEN FORM <br />In addition to any manufacturer’s warranties, Contractor warrants and guarantees to the Town <br />that all work will be in strict accordance with the Contract Documents and will not be defective. <br />All defective Work, whether or not in place, may be rejected, corrected or accepted as provided <br />below. <br />2.33.1 Correcting Defects Covered Under Warranty <br />The Contractor shall be responsible for promptly correcting any deficiency, at no cost to <br />the City, within seven (7) calendar days after the City notifies the Contractor of such <br />deficiency in writing. If the Contractor fails to satisfy the warranty within the period <br />specified in the notice, the City may (a) place the Contractor in default of its contract, <br />and/or (b) procure the products or services from another source and charge the Contractor <br />for any additional costs that are incurred by the City for this work or items; either through <br />a credit memorandum or through invoicing. <br /> <br />2.33.2 Owner May Stop the Work <br /> <br />If the Work is defective or Contractor fails to supply sufficiently skilled workers or suitable <br />materials or equipment, or fails to furnish or perform the Work in such a way that the <br />completed Work will strictly conform to the Contract Documents, Town may order <br />Contractor to stop the Work, or any portion thereof, until the cause for such order has <br />been eliminated. However, this right of Town to stop the Work shall not give rise to any <br />duty on the part of Town to exercise this right for the benefit of Contractor or any other <br />party. <br /> <br />2.34 ONE YEAR CORRECTION PERIOD <br /> <br />In the event any work is found to be defective within one year after the date of Final Completion, <br />Contractor shall promptly, without cost to City and in accordance with City’s written instructions, <br />either correct such defective Work, or, if it has been rejected by City, remove it from the site and <br />replace it with non-defective Work. If Contractor does not promptly comply with the terms of such <br />instructions, or in an emergency where delay would cause serious risk of loss or damage, City may <br />have the defective Work corrected or the rejected Work removed and replaced, and all direct, <br />indirect and consequential costs of such removal and replacement (including but not limited to fees <br />and charges of engineers, architects, attorneys and other professionals) will be promptly paid by <br />Contractor. Nothing in this ITB or the Contract shall be construed as a limitation on any right or <br />remedy for breach of the Contract or defects in the Work. All rights set forth herein and in the <br />Contract shall be deemed cumulative and in addition to any rights or remedies which may be <br />afforded by Florida law. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.