My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Bay Road Drainage Improvements
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
North Bay Road Drainage Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/2/2018 4:14:30 PM
Creation date
5/2/2018 4:09:32 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach | Invitation to Bid No. North Bay Road Drainage Improvements 18-04-01 21 <br /> <br />2.35 “AS BUILT” RECORD DOCUMENTS <br /> <br /> The Contractor shall supply the Owner with one (1) set of “As Built” record drawings, three (3) <br /> sets of signed and sealed drawings, and a CD with the electronic CAD drawings in State Plane <br /> Coordinates NAD 1983 with the 1990 Adjustment, if applicable, indicating the final installation <br /> of all the infrastructure placed as part of this project, as well as all modifications made due to <br /> field conditions, change orders, et cetera. Surveying and layout expenses are the responsibility <br /> of the Bidder. <br /> <br />2.36 LIQUIDATED DAMAGES FOR INCOMPLETE PROJECTS <br />The Contractor is obligated and guarantees to complete the Project in the time set forth in the <br />Contract or any approved extension of time the Contractor may be granted by the City Manager. <br />The Contractor will be notified in writing of any approved exceptions or extensions by the City <br />Manager. Failure to complete the project in accordance with the specifications and to the <br />satisfaction of the City within the time stated for substantial and/or final completion shall cause the <br />Contractor to be subject to charges for liquidated damages for each and every calendar day the <br />work remains incomplete beyond these deadlines. The liquidated damages amounts are as follows: <br /> <br />Original Contract Amount Daily Charge Per Calendar Day, weekends and holidays included <br /> <br />$500,000 but less than $2,500,000 ................................................................................. $1,584 <br /> <br />As compensation due to the City for loss of use and for additional costs incurred by the City due to <br />such non-completion of the work, the City shall have the right to deduct the said liquidated <br />damages from any amount due, or that may become due to the Contractor under this agreement, <br />or to invoice the Contractor for such damages if the costs incurred exceed the amount due to the <br />Contractor. <br /> <br />2.37 FRAUD AND MISREPRESENTATION <br /> <br />The City may terminate this Contract based on any attempt by the Contractor to meet its <br /> contractual obligations with the City through fraud, misrepresentation or material misstatement. <br /> Should this occur the Contractor will be responsible for all direct or indirect costs associated with <br /> termination or cancellation of the Contract. <br /> <br />2.38 BACKGROUND CHECKS <br /> <br />The successful Firm will be responsible for hiring the necessary personnel to conduct the specified <br />services and will comply with all federal, state, and local laws related to minimum wage, social <br />security, nondiscrimination, Americans with Disabilities Act (“ADA”), unemployment compensation, <br />and workers’ compensation. All staff assigned to this contract shall be required, at their sole cost <br />and expense, to pass a criminal background check prior to award of the contract. The c riminal <br />background check shall consist of a Florida Department of Law Enforcement (“FDLE”) Florida Crime <br />Information Center/National Crime Information Center (“FCIC/NCIC”) criminal records check. Any <br />employee not meeting this requirement will not be permit ted to work at any City facility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.