Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH SECTION 01030- 1 <br />HURRICANE PREPAREDNESS <br />  <br />SECTION 01030 <br />HURRICANE PREPAREDNESS <br />PART 1 - GENERAL <br />1.1 HURRICANE PREPAREDNESS PLAN <br /> <br />A. The CONTRACTOR’s attention is drawn to the possibility of hurricane or severe storm <br />conditions occurring at the site of work during the course of Contract Work. <br /> <br />B. Within fourteen (14) days of the date of the Notice to Proceed, the CONTRACTOR shall <br />submit to the ENGINEER and OWNER a Hurricane Preparedness Plan. The plan <br />should outline the necessary measures which the CONTRACTOR proposes to perform <br />at no additional cost to the OWNER in case of a hurricane or severe weather warning. <br /> <br />C. In the event of inclement weather, or whenever the OWNER shall direct, the <br />CONTRACTOR shall, and will, cause Subcontractors to protect carefully the Work and <br />materials against damage or injury by reasons of failure on the part of the <br />CONTRACTOR or any Subcontractor to so protect the Work. Such Work and materials <br />so damaged shall be removed and replaced at the expense of the CONTRACTOR. <br /> <br />1. Hurricane Watch: Upon designation of a hurricane watch, the CONTRACTOR <br />shall be responsible for storing all loose supplies and equipment on the job site <br />that may pose a danger. In addition, the CONTRACTOR shall remove all <br />bulkheads and plugs in pipelines that would impede drainage in the case of <br />flooding. Structures that may be in danger of floatation shall be flooded. The <br />CONTRACTOR shall also cooperate with the OWNER in protecting any other <br />structures at the site. <br />2. Hurricane Warning: No mobile “temporary facility” under the control of or on the <br />property of the OWNER shall be staffed during a hurricane warning. <br />CONTRACTOR facilities meeting these criteria shall be evacuated. Reasonable <br />steps shall be taken to protect all such facilities and their contents from damage <br />and to avoid the facility causing damage to the surroundings. <br />PART 2 – PRODUCTS <br />NOT USED <br />PART 3 – EXECUTION <br />NOT USED <br />END OF SECTION