My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jaffer Well Drilling
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
Responses
>
Jaffer Well Drilling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 9:28:48 AM
Creation date
5/3/2018 9:26:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
North Bay Road Drainage Improvements
Bid No. (xx-xx-xx)
18-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t t. <br /> Staffing <br /> All Jaffer managerial staff member have at least 2 years of <br /> experience in construction in South Florida. <br /> Jaffer Staff includes: <br /> Mr. Mario Aguerreberez Civil Engineer Project Manager <br /> Mr. Gary Braganza PG Project Manager. <br /> Mr. Ariancis Hernandez Geologist Project Manager. <br /> Mr. Juan Cepeda Electronic Engineer Production Manager <br /> Mr. Andres Bertoni Civil Engineer Production Manager <br /> Ms. Silvana Sinning Office Manager <br /> Ms. Nayla Pinero Office Manager. <br /> Resumes for key personnel are included in Appendix E <br /> Jaffer currently plans on utilizing one subcontractor: <br /> Utility Masters Inc. (Lic E992100) 902 SW 138 Ct. Miami Fl 33184. <br /> Jaffer has obtained prices for the CheckMate TideFlex Valves from <br /> Tideflex Technologies 600 N Bell Ave Carnegie, PA 15106. <br />
The URL can be used to link to this page
Your browser does not support the video tag.