My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jaffer Well Drilling
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(18-04-01) North Bay Road Drainage Improvements
>
Responses
>
Jaffer Well Drilling
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2018 9:28:48 AM
Creation date
5/3/2018 9:26:27 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
North Bay Road Drainage Improvements
Bid No. (xx-xx-xx)
18-04-01
Project Type (Bid, RFP, RFQ)
Bid
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t. <br /> Approach / Methodology <br /> Jaffer's approach to a new construction project is to assign the <br /> team that will manage the project. Typically, the preliminary team <br /> consists of the Project Manager, the Production Manager, and the <br /> Drilling Superintendent. Everyone will review the schedule and cost <br /> estimate, prepare review comments,. and offer value engineering <br /> suggestions. We believe the team approach and front-end planning <br /> is vital to a successful project. <br /> A more specific approach to this project is outlined in the bullets <br /> below. <br /> • Request a preconstruction meeting with the city to <br /> discuss all concerns the city might have. <br /> • Video each well <br /> • Mobilize (1 or 2) rigs depending on impact to residents <br /> • In Addition to truck mounted drill rigs Jaffer has a mini <br /> skid mounted drill rig that offers a minimal impact to <br /> residents. Picture attached Appendix F <br /> • Clean each well and well box <br /> • Isolate cleaned wells with a pass through well plug for <br /> video <br /> • Tide Flex valves will be installed from the water side <br /> This project is located inside a community and it's important to <br /> the City, and Jaffer, to minimize the impact on the people living within <br /> the confines of the project. Teamwork, planning, and common sense <br /> allows us to be successful in the completion of our work in a timely <br /> and cost-efficient manner. Our professional and licensed personnel, <br /> and their vast years of experience, provides a safe, professional <br /> environment in the field and the office. <br /> References are included in Appendix G <br />
The URL can be used to link to this page
Your browser does not support the video tag.