My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2027
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 11:56:40 AM
Creation date
2/27/2013 11:40:25 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2027
Date (mm/dd/yyyy)
02/21/2013
Description
Awd RFP 12-04-05 & Agmt w/Keith & Schnars Utility Underground Cons. Srvs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 2-Meetings I Coordination with FP&L and Utilities <br /> Subtask 2.1 -Tnrough series of meetings, five (5) anticipated, CONSULTANT to introduce project to <br /> FP&L and identify project as defined by CLIENT. The purpose of meetings will be to determine project <br /> details, including existing and proposed utility locations, service connections, easements, service <br /> •requirements, timelines, phasing, limitations, tariff, responsibilities (FP&L, CITY, and CONSULTANT), <br /> preliminary costs,and other information needed to move the projects forward. <br /> Subtask 2.2 - Subsequent to meeting with FP&L, CONSULTANT to meet with other utilities to <br /> introduce project and identify project details, including existing and proposed utility locations, service <br /> connections, easements, service requirements, timelines, phasing, limitations, permit procedures, <br /> preliminary costs, pole/line agreements, relocation and other information needed to move the projects <br /> forward. CONSULTANT assumes Up to three (3) meetings to address phone, cable, water and <br /> sanitary issues. <br /> Subtask 2.3 - Subsequent to meeting with FP&L, CONSULTANT shall meet with FDOT to introduce <br /> project and identify requirements and restrictions as well as existing infrastructure. In addition, <br /> CONSULTANT shall discuss requirements to combine project with the FDOTs planned RRR project <br /> Discussions shall be incorporated into design considerations and discussion with utilities. <br /> Subtask 2.4 - In providing the above services, CONSULTANT shall attend periodic meetings with <br /> CLIENT to provide review and update of findings. The frequency of meetings will be as determined by <br /> CLIENT predicated by progress and issues that arise. Services for this task to be billed on a T&M <br /> basis with approval from CLIENT. For the purpose of this proposal, CONSULTANT estimate of effort <br /> assumes an average of 3 hours per week over a period of 12 weeks to be spent on meetings and <br /> coordination with CLIENT. <br /> Subtask2.5 - Separate but related to undergrounding of utilities, CONSULTANT shall explore issue <br /> of lighting problems currently experienced within Collins Avenue. Previous correspondence between <br /> City Staff, County, FP&L, and FDOT suggest the fixtures have outlived their design life resulting in <br /> increased maintenance and outages. Ownership of the fixtures belongs with FDOT District VI. A more <br /> conclusive assessment of the system is required to identify deficiencies by type and severity. This task <br /> is to provide an elementary assessment of conditions from field observations and readily available <br /> information with the intent of suggesting improvements to be incorporated into undergreuhd rig design. <br /> Services for this task to be billed on a T&M basis with approval from CLIENT. For the purpose of this <br /> proposal, CONSULTANT estimate of effort assumes up to 10 hours be spent on meetings and <br /> coordination. <br /> Professional'Services Agreement <br /> Project Name: Utility Underground'uig Consulting <br /> Project Location:Sunny Isles Beach,FL <br /> WKKEITH and SCI MARS, RA. K&S Proposal No.:P5098.MK <br /> ENGINEERS,PLANNERS,SURVEYORS Revised F ebruary 5,2013 Page 5 <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.