My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2027
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2027
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/12/2013 11:56:40 AM
Creation date
2/27/2013 11:40:25 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2027
Date (mm/dd/yyyy)
02/21/2013
Description
Awd RFP 12-04-05 & Agmt w/Keith & Schnars Utility Underground Cons. Srvs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 3—Bidding/Construction: <br /> Step 7. Bidding: The agreement with FP&L will result in a binding estimate as a turn-key project for <br /> FP&L improvements only. For a complete scope of services, the CITY will bid the Construction <br /> Documents as submitted for permit Upon selection of Contractor demonstrating certification from <br /> FP&L,the tariff will require modification to account for the diminished services provided by FP&L. <br /> Step 8. Construction: The key to a successful construction process is adherence to schedule <br /> without cost increases and minimal disruption to the public. Public involvement, although a necessary <br /> component throughout the process, will be critical during the construction phase to provide public <br /> awareness and addressing concems/questions. Depending upon the type and extent of <br /> improvement, certification for compliance with permits may be required. If desired, CITY could elect to <br /> have a full time project representative associated with the projects to act as a liaison between the CITY <br /> and public or handle through staff. Finally, upon completion, as-builts are collected, reviewed and <br /> distributed,permits and contracts are closed out, bonds and final payments released. <br /> 3.0 SCOPE OF SERVICES <br /> Services to be provided by CONSULTANT under this initial Work Authorization shall pertain to Project <br /> Assessment (Phase 1) Only as related to approximately 22 miles of Collins Avenue. In addition to <br /> Undergrounding, CONSULTANT shall investigate the ongoing malfunction of streetlights along Collins <br /> Avenue with the intent of identify the process through which a solution can be implemented in conjunction <br /> with Undergrounding efforts. Tasks for subsequent phases will be defined under separate Work <br /> authorization. Services for this work authorization shall include the following. <br /> TASK 1 —Prepare Preliminary Cost Estimate <br /> Subtask 1.1 —Based upon kickoff meeting With the CITY, CONSULTANT shall compile budgetary cost <br /> estimates for the complete project. Further, with the level of input available from the identified utilities, <br /> CONSULTANT will prepare a preliminary schedule of the project for use in assisting the CITY in <br /> updating of the Capital Improvement Plan (CIP). CLIENT understands that at this stage,the project is <br /> extremely Conceptual with minimal input provided by FP&L or other Utilities. Budget estimates are to <br /> be based upon general assumptions validated where possible by FP&L and Utility providers. <br /> Estimates will identify general assumptions and qualifications. <br /> Subtask 1.2 — Attend one Staff and one Commission meeting to introduce the project, process, <br /> budget, and schedule via PowerPoint presentation. <br /> Professional Services Agreement <br /> Project Name: Utility Undergrounding Consulting <br /> ° Project Lochner':Sunny Isles Beach,FL <br /> Y : P KEITH and SCHNARS, A. K&S Proposal No:P5098.11/4/11C <br /> ILIF ENGINEERS,PLANNERS,SURVEYORS Revised February 5,2013 'Page 4 <br /> • <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.