Awd RFP 12-04-05 & Agmt w/Keith & Schnars Utility Underground Cons. Srvs.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase 2—Design and Permitting <br /> Step 4. FP&L Tariff Agreement: FP&L has a program in place for municipal undergrounding <br /> projects. Under the conditions of the program the CITY would enter into an agreement with FP&L. <br /> The agreement would require a non-refundable deposit to FP&L for design services resulting in the <br /> following: <br /> • 85%design with sufficient detail for permit submittal(FP&L services only). <br /> • A firm cost for installation (assumes turn-key project from FP&L). <br /> • An outline for credit and conditions(up to 25%credit available). <br /> • 180-day window for acceptance(extensions likely but with potential for additional cost). <br /> Obviously the ability of FP&L to respond will depend upon the complexity of the request, but the <br /> general response time for design projects is 16 weeks upon receipt of 10% design deposit. It is <br /> important to note that FP&L design will only address FP&L services. Plans will need to be coordinated <br /> with other utilities to further define project requirements. <br /> Step 5. Utility Coordination: Once complete, the FP&L design requires coordination with other <br /> utilities. Pole-line agreements need to be severed and new easement and/or right-of-way agreements <br /> prepared. Street Lighting needs to be designed to replace the Cobra-heads removed with existing <br /> power poles. General coordination with existing utilities needs to include location of traffic signalization <br /> boxes, pull boxes, transformers, switchgear, and water/sewer services. Service connections across <br /> private properties need to be addressed. As a condition of the Tariff Agreement, FP&L will obligate the <br /> CITY to see that service connections are Made within the agreed upon timeframe. With the elimination <br /> of overhead poles, private services and transformers will be dropped. Discussions need to include <br /> potential phasing.of Work.as related to the specific utility. It may be that a component that defines the <br /> phase limits for one utility does not coincide with component defining phasing for another. <br /> Step 6. Prepare Construction Documents: Once all of the design issues and requireients have <br /> been identified, construction documents coordinating and addressing utility concerns are prepared. <br /> These plans are used for circulation athorig Stakeholders for confirmation of improvements and <br /> submittal to appropriate perinit•agencies. Final Plans will be used in bid documents. At this stage, in <br /> addition to firm estimates from FP&L, an estimated cost of Other utility relocation will be compared <br /> against the project budget. <br /> Prbiessional Services Agreement <br /> • Project Name: Utility Undergrounding Consulting <br /> ° - Project Location:Sunny Isles Beach,FL <br /> 5 KEITH and SCHN'ARS, P.A. K&S Proposal No.:P5098.MK <br /> ENGINEERS,PLANNERS;SURVEYORS Revsed February ebruary 5,2013 Page 3 <br />