Laserfiche WebLink
w. <br /> axioma3lar®hite®ts CL <br /> Architecture I Engineering I Interior Design Corporate Office S 305.667.6333 <br /> Planning I TND I Zoning Approvals 7418 SW 48th Street n 305.667.6670 <br /> LEED Building Design Miami,FL 33155 I USA mail @axioma3.com <br /> Memo 03 <br /> Date: January 11, 2013 <br /> To: Mr. Joe Milton <br /> 4M investors, LLC <br /> j o s e o h m i l to n na j-m i t to n.co m <br /> Project: Gateway Park <br /> Project No: 35-600-5688 <br /> Dear Joe, <br /> Included herein please find a description of NE related work affecting the new design concept <br /> of the referenced project. <br /> Parking Garage Structure with Banquet Hall (or Restaurant) Facility <br /> 1) Based on the "Shopping List" information we received from Clay Parker(dated 12/14/12) <br /> the entire building has to be re-designed and this effort affects every discipline — No <br /> aspect of the currently completed Construction Documents can be re-used since the <br /> architectural and engineering aspect of the building is completely different, including <br /> many new items and specific structural requirements that we will need to implement in <br /> the new design. <br /> 2) Keep in mind that the efforts and work related to all of the disciplines is more substantial <br /> than the previous concept, since we are now de-signing the "back bone" for the future <br /> restaurant or banquet hall facility. <br /> Park Amenities/ Landscape Areas <br /> 1) Due to the new design and layout of the Parking Garage / Banquet Hall building there <br /> are adjacent areas that will need to be re-design and /or altered to best accommodate <br /> the building and its functions. <br /> Corporate Registration/AA0002273 <br /> Architect Registration/AR 14049 `� <br />