My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2020
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 11:00:50 AM
Creation date
3/8/2013 11:00:46 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2020
Date (mm/dd/yyyy)
01/30/2013
Description
Amd Design/Build Budget for Gateway Park, Pkg Garage, & Ped. Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr.Joe Milton <br /> 4M Investors.LLC <br /> January 11,2013 <br /> 2) The changes affect Architecture, Landscape Architecture, Civil, Mechanical, Electrical, <br /> Plumbing, and Structural Engineering as described below. <br /> a) The south edge of the garage building will be re-designed as an exterior dining <br /> terrace (serving the restaurants) therefore changing the plans from its current <br /> garden concept. <br /> b) The north edge of the garage building will be re-designed to accommodate the <br /> service and back-of-house requirements of the restaurant facility, including all of <br /> the utility requirements for same facilities. <br /> c) The west edge of the garage building will now have a set-back of 10'-0° therefore <br /> requiring adjustments to the current landscape plan. <br /> d) The east edge Plaza area requires redesign since the parking garage building is <br /> longer than the previous concept. <br /> e) The water wall and children water feature will require adjustments to its size and <br /> layout in order to accommodate pedestrian accessibility from the north sidewalk <br /> and the future pedestrian bridge. <br /> f) We need to re-design the sprinkler system drawings as it relates to all of the <br /> affected green areas and new planting areas. <br /> g) We need to re-design the site lighting plan as it relates to all of the affected <br /> pedestrian paths, green areas and new planting areas. It is also anticipated that <br /> the site lighting concept will need to be a bit more extensive, especially as it <br /> relates to the restaurant facility (at the ground level) and the exterior dining <br /> areas. <br /> h) The civil plans will require substantial modifications as it relates to new curb cuts, <br /> water & sewer connections and the more complex utility systems that will serve <br /> the multiple restrooms, kitchens and the facility in general. <br /> I am certain that there are many other lesser items that are also affected by the re-design, but <br /> these are the main items that I can think off at this moment. <br /> The new design fee and time schedule breakdown is as follows: <br /> Description NE Fee Time Schedule <br /> Conceptual Design Plans $ 350,000 30 days <br /> Construction Documents $890,000 6 months <br /> Permitting $ 50,000 To be determined by the City <br /> e_. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.