My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2020
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 11:00:50 AM
Creation date
3/8/2013 11:00:46 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2020
Date (mm/dd/yyyy)
01/30/2013
Description
Amd Design/Build Budget for Gateway Park, Pkg Garage, & Ped. Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AECOM <br /> AECOM <br /> 800 Douglas Entrance.North Tower.2'4 Floor,Coral Gables,Florida 33134 <br /> T 305.444.4691 F 305.447.3580 www.aecom.com <br /> Memorandum <br /> Date: January 29, 2013 <br /> To: Christopher Russo <br /> From: Nina Gladstone. <br /> Subject: Gateway Park and Parking Garage <br /> Distribution: Agustin Barrera <br /> Chris, <br /> In your letter dated January 25, 2013, the City of Sunny Isles Beach has asked AECOM to review the <br /> re-design proposal drawings submitted by 4M Investors, LLC regarding the Gateway Park and Parking <br /> Garage. <br /> Based on our review of the Axioma3 Architects drawings for the parking garage, the drawings would <br /> have to be completely revised to incorporate the 16,000 SF shell space on the ground floor and a <br /> revised structural grid to provide as much unobstructed space in the shell space as possible. <br /> In our opinion, this modification would have a minimal affect on the drawings for the park, mostly <br /> coordinating entrances and site re-grading. <br /> We have based an analysis of fees (See Attachment A) for this re-design on the State of Florida <br /> Department of Management Services AE Fee Calculator which is a tool available to the public and <br /> professionals on-line. It is a good baseline used by many Counties in procuring professional services. I <br /> have included those guidelines with this letter. <br /> We estimate the cost to redesign the garage and shell space to be $826,130. This fee would include <br /> revised contract documents, permitting, and construction administration services.The information I have <br /> provided above, is only an estimate of design costs based on the information we have been provided. <br /> The below the line additional services items and expenses costs are based on our professional opinion <br /> and on other similar projects.These items would need further discussion and development. <br /> You also asked about design-build projects and the information that the Owner should be provided by <br /> the design builder. Typically, in design build projects, the Owner enters into an agreement with the <br /> design builder regarding scope of work and the cost of the work. See below excerpt for the American <br /> Institute of Architects: <br />
The URL can be used to link to this page
Your browser does not support the video tag.