Laserfiche WebLink
memoranaum <br /> Page 2 <br /> Date:January 29, 2013 <br /> A141-2004,Agreement Between Owner and Design-Builder <br /> AIA Document A141”4-2004 replaces ALA Document A191"4-1996 and consists of the agreement and three <br /> exhibits:Exhibit A,Terms and Conditions; Exhibit B, Determination of the Cost of the Work;and Exhibit C, <br /> Insurance and Bonds. Exhibit B is not applicable if the parties select to use a stipulated sum.AIA Document A141- <br /> 2004 obligates the design-builder to execute fully the work required by the design-build documents,which include <br /> A141 with its attached exhibits,the project criteria and the design-builder's proposal, including any revisions to <br /> those documents accepted by the owner,supplementary and other conditions,addenda and modifications.The <br /> Agreement requires the parties to select the payment type from three choices: (1)Stipulated Sum, (2)cost of the <br /> work plus design-builder's fee,and(3)cost of the work plus design-builder's fee with a guaranteed maximum price. <br /> A141-2004 with its attached exhibits forms the nucleus of the design-build contract. Because A141 includes its own <br /> terms and conditions, it does not use AIA Document A201 T". <br /> Hope the above helps the City of Sunny Isles with the Gateway Park project. I am available if you would <br /> like to discuss further. <br /> • <br /> We look forward to our continued work with the City of Sunny Isles to review the 3i° Floor area of the <br /> City Hall to enhance to usage of the space. <br /> Thanks, <br /> • <br /> Nina Gladstone, TEED AP <br /> Associate Principal <br /> AECOM Design <br />