My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2013-2020
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2013
>
Reso 2013-2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2013 11:00:50 AM
Creation date
3/8/2013 11:00:46 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2013-2020
Date (mm/dd/yyyy)
01/30/2013
Description
Amd Design/Build Budget for Gateway Park, Pkg Garage, & Ped. Bridge
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GATEWAY PARK GARAGE <br /> SHOPPING LIST <br /> 12/14/12 <br /> Listed below are the redesign criteria requested by the City for the Gateway Park Garage. This <br /> list is being compiled after an initial meeting that was held between Jaime Eisen, Helen Gray, <br /> Eduardo Castineira, and Clay Parker on 12/4/2012: <br /> 1. New garage design to be divided into two zones with 60' clear each side providing <br /> parking spaces 18' deep, parking access drive 24' wide. This will be similar to Heritage <br /> design. <br /> 2. No interior columns(open design), similar to Heritage. <br /> 3. Ground level height will be 15' slab to slab, to allow the development of usable ground <br /> floor space for future facility. Ground level clear height to be from 12'6"to 14'. <br /> 4. Additional floors, floor to floor height should be adjusted to maintain a minimum clear <br /> headroom height with sprinkler system at 7' 6". <br /> 5. Enclose approximately 16,000 square feet of ground floor air conditioned space on the <br /> South side of parking garage for future facility. <br /> 6. The South perimeter wall of the parking structure to be designed utilizing a transfer <br /> beam to carry the load of the upper floors of the garage, allowing for the open design of <br /> the enclosed 16,000 square foot space, all the way to the south wall. <br /> 7. The South and East perimeter walls of the enclosed 16,000 square feet space should <br /> utilize as much glass storefront as possible. <br /> 8. All glazing for the entire project shall utilize impact safety glass to meet the High Wind <br /> Zones of the Florida Building Code. <br /> 9. Exhaust vents and electrical service through ramp area to the north (not to the roof). <br /> 10. Air Conditioning/Refrigeration Condensers to be placed on the North side of the <br /> building. <br /> 11. Maintain design for 308 parking spaces as spelled out in the Design-Build agreement. <br /> 12. All handicap parking on ground level. (8 spaces) <br /> 13. The current design shows the West end of the parking structure at 18' 6" to the <br /> property line. The west setback by zoning ordinance is 15'. However, it could be <br /> reduced, as needed, for lengthening of parking structure to meet the 6% grade for <br /> parking on ramp. If needed, the West set back could be reduced to a minimum of 10' by <br /> variance. <br /> 14. The previous design located the entrance drives 50' east of the west end of the garage. <br /> This was done to support the two future elevators that are not going to be needed and <br /> could be moved closer to the west end, giving us the needed additional length to allow <br /> for parking ramps. <br />
The URL can be used to link to this page
Your browser does not support the video tag.