My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> 2. Payment for furnishing and installing of limerock base material will be made <br /> at the unit price per cubic yard at the depth indicated and named in the Bid <br /> Schedule, which price shall constitute full compensation for applying prime <br /> coat and furnishing all such material, in place, including all transportation, <br /> 1 handling, cleaning, positioning and compacting of said bedding to a Load- <br /> Bearing-Ratio of One-hundred (LBR 100), and disposal of waste or <br /> unsuitable material. <br /> J. Compaction/Stabilization of Subgrade <br /> 1. Measurement for payment for compaction/stabilization of subgrade will be <br /> based upon the number of square yards of such materials actually <br /> compacted, all in accordance with the Contract Documents. <br /> 2. Payment for compacting/stabilizing of subgrade will be made at the unit price <br /> per square yard named in the Bid Schedule, which price shall constitute full <br /> compensation for handling, cleaning, positioning and compacting of said <br /> bedding to a Load-Bearing-Ratio of Forty (LBR 40), importing fill material and <br /> disposal of excess waste or unsuitable material. <br /> K. Furnish and Install Curb, Curb and Gutter and/or Valley Gutter <br /> 1. Measurement for payment for furnishing and installing curb, curb and gutter, <br /> 1 and/or valley gutter will be based upon the number of linear feet of such <br /> curbing actually constructed as determined by measurement along the <br /> centerline of the curb in place, all in accordance with the Contract <br /> Documents. <br /> 2. Payment for furnishing and installing curb, curb and gutter, and/or valley <br /> gutter will be made at the unit price per linear foot of such curbing named in <br /> t the Bid Schedule, which price shall constitute full compensation for complete <br /> installation including grading, placing 4" limerock pad, forming, saw cutting of <br /> pavement and cleanup of all areas disturbed by this construction. <br /> L. Clear and Grade Swale <br /> 1. Measurement for payment for clearing and grading swale will be based upon <br /> the number of square yards of swale actually cleared and graded, all in <br /> accordance with the Contract Documents. <br /> 2. Payment for clearing and grading swale will be made at the unit price per <br /> square yard of clearing and grading named in the Bid Schedule, which price <br /> 1 shall constitute full compensation, including earthwork, importing of fill <br /> material, removal and disposal of excess material including but not limited to <br /> brush, bollards, shrubs, concrete, sod, and protection of trees to remain. <br /> Swale is defined as the area between the edge of pavement to the right-of- <br /> way line, excluding all driveway aprons and concrete sidewalks. <br /> 1 <br /> 05/08 01025-5 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.