Laserfiche WebLink
1 <br /> 1 <br /> M. Roadway Resurfacing/Overlay <br /> 1. Measurement and payment for roadway resurfacing will be based upon the <br /> number of square yards of such roadways actually resurfaced, all in <br /> accordance with the Contract Documents. <br /> 2. Payment for roadway resurfacing will be made at the unit price per square <br /> yard named in the Bid Schedule, which price shall constitute full <br /> compensation for roadway resurfacing, including but not limited to the <br /> removal, by milling of the top 3/4" of existing roadway pavement, removal of <br /> existing reflective pavement markers, restoration of traffic loop detectors, <br /> application of tack coat, and '/." overlay of Type S-3 asphalt in place. <br /> 3. Payment for maintenance and protection of traffic shall be made under the <br /> 1 maintenance and protection of traffic item named in the Bid Schedule. <br /> N. Furnish and Install Concrete Sidewalks — 5 foot Wide <br /> 1. Measurement for payment for furnishing and installing sidewalks will be <br /> based upon the actual number of square yards of such sidewalks constructed <br /> as shown in the drawings, all in accordance with the Contract Documents. <br /> 2. Payment for furnishing and installing sidewalks will be made at the unit price <br /> e per square yard named in the Bid Schedule, which price shall constitute full <br /> compensation for completing said work, including all earthwork, compaction <br /> and stabilization of subgrade, construction of the sidewalk, compliance with <br /> current ADA regulations, furnishing and setting for expansion joint material, <br /> backfilling of sidewalk, grading and complete restoration of private property <br /> including sod due to installation of sidewalk, disposal of excess material, <br /> protection of trees to remain, handrail where protection is needed, and the <br /> B appurtenant items for which separate payment is not specifically included in <br /> the Bid Schedule. Excess material includes, but is not limited to, brush, <br /> bollards, shrubs, concrete and any other material that inhibits the installation <br /> of sidewalk. <br /> O. Remove and Dispose of Existing Sidewalk <br /> 1. Measurement for payment to remove and dispose of existing sidewalks will <br /> be based upon the actual number of square yards of such sidewalks and/or <br /> curb removed, all in accordance with the Contract Documents. <br /> 2. Payment for removal and disposal of existing sidewalks will be made at the <br /> unit price per square yard named in the Bid Schedule, which price shall <br /> constitute full compensation for the removal and disposal of sidewalk and/or <br /> curb, restoration of areas disturbed by the operation, complete. <br /> P. Relocate Existing Mailbox <br /> 1. Measurement for payment for relocation of existing mailboxes will be based <br /> B upon the actual number of mailboxes relocated, all in accordance with the <br /> Contract Documents. <br /> 05/08 01025-6 05-4893 <br />