My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> T. Remove and Dispose Existing Street Sign <br /> 1. Measurement for payment to remove and dispose existing signs will be <br /> based upon the actual quantity, each, of such signs actually removed from <br /> the right-of-way, all in accordance with the Contract Documents. <br /> 2. Payment for removal and disposal of existing signs will be made at the unit <br /> price, each, named in the Bid Schedule, which price shall constitute full <br /> compensation for the removal and disposal of existing signs. <br /> U. Furnish and Install Street Signs (With Post) <br /> 1. Measurement for payment to furnish and install signs will be based upon the <br /> actual quantity, each, of such signs furnished and installed, all in accordance <br /> with the Contract Documents. <br /> 2. Payment for furnishing and installing signs will be made at the unit price, <br /> each, named in the Bid Schedule, which price shall constitute full <br /> compensation for the completed installation of the sign including post, and all <br /> else necessary for a complete and functional installation. <br /> V. Furnish and Install Text or Directional Arrow <br /> 1. Measurement for payment to furnish and install text or directional arrows will <br /> be based upon the actual quantity, each, of such text or directional arrows <br /> furnished and installed, all in accordance with the Contract Documents. <br /> 2. Payment for furnishing and installing text or directional arrows will be made at <br /> the unit price, each, text or arrow with associated lines, named in the Bid <br /> Schedule, which price shall constitute full compensation for the work of the <br /> 1 complete installation. <br /> W. Relocate Existing Utility Poles <br /> 1. Measurement for payment for relocation of existing utility poles will be based <br /> upon the actual number of utility poles relocated, all in accordance with the <br /> Contract Documents. <br /> 2. Payment for relocating existing utility poles will be made at the unit price <br /> name in the Bid Schedule, which price shall constitute full compensation for <br /> the complete relocation of the utility poles. Utility poles shall be relocated in <br /> accordance with local or governing power company regulations. <br /> 3. No separate payment shall be made for temporary relocation of existing utility <br /> poles required during construction. <br /> 1 X. Project Mobilization <br /> 1. The project mobilization item shall be administered in accordance with the <br /> Florida Department of Transportation, Standard Specifications for Road & <br /> Bridge Construction (latest edition); MOBILIZATION. <br /> 05/08 01025-8 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.