My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> SECTION 01046 <br /> MODIFICATIONS TO EXISTING STRUCTURES, PIPING AND EQUIPMENT <br /> BPART 1 - GENERAL <br /> 1.01 WORK INCLUDED <br /> A. Furnish all labor, materials, equipment and incidentals required to modify, alter <br /> and convert existing structures as shown or specified and as required for the <br /> installation of new mechanical equipment, piping and appurtenances. Work shall <br /> be performed within the requirements of Special Project Procedures in Section <br /> 01030 and required Construction Scheduling in Section 01310. Existing piping <br /> and equipment shall be removed and dismantled as necessary for the <br /> performance of structural alterations in accordance with the requirements herein <br /> specified. <br /> 1.02 RELATED WORK <br /> A. Section 01045: Cutting and Patching <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION <br /> 3.01 GENERAL <br /> 1 A. The Contractor shall cut, repair, reuse, excavate, demolish or otherwise remove <br /> parts of the existing structures or appurtenances, as indicated on the Contract <br /> Drawings, herein specified, or necessary to permit completion of the work under <br /> this Contract. <br /> 1 B. Blasting with explosives will not be permitted to complete any work under this <br /> Contract. Care shall be taken not to damage any part of existing buildings, <br /> foundations and exterior structures both below and above ground. <br /> 1 C. No existing structure, equipment, or appurtenance shall be shifted, cut, removed, <br /> or otherwise altered except with the express approval of and to the extent <br /> approved by the Engineer. <br /> D. Materials and equipment removed in the course of making alterations and <br /> 1 additions shall remain the property of the Owner, except that items not <br /> salvageable, as determined by the Engineer and the Owner shall become the <br /> property of the Contractor to be disposed of by him off the site of the work at his <br /> own place of disposal. <br /> E. All work of altering existing structures shall be done at such time and in such <br /> manner as will comply with the approved time schedule. So far as possible <br /> before any part of the work is started, all tools, equipment, and materials shall be <br /> 05/08 01046-1 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.