My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 <br /> SECTION 01050 <br /> FIELD ENGINEERING <br /> PART 1 - GENERAL <br /> 1.01 WORK INCLUDED <br /> tA. Provide and pay for field engineering services required for Project as follows: <br /> 1. Civil, structural, geotechnical, or other professional engineering services <br /> specified, or required to execute the Contractor's construction methods. <br /> ' 2. Land surveying required to layout the work. <br /> B. The Contractor shall retain the services of a registered land surveyor licensed in <br /> the State of Florida for the line, grade, and right-of-way layout. <br /> 1.02 RELATED WORK <br /> A. Section 01010: Summary of Work. <br /> 1.03 QUALIFICATIONS OF PROFESSIONAL <br /> A. Qualified Engineer or Registered Land Surveyor, acceptable to the City and the <br /> 1 Engineer. <br /> B. Registered Professional Engineer of the specialty required for the specific service <br /> on the Project, currently licensed in the State of Florida. <br /> 1.04 RECORDS <br /> A. Maintain a complete, accurate log of all control and survey work as it progresses. <br /> B. At the end of the project, submit certified as-built information at the same scale as <br /> the irrigation designer's line drawings indicating elevations and locations of all <br /> irrigation piping, heads, valves, pump, controller, and connections. <br /> 1.05 SUBMITTALS <br /> A. Submit name and address of registered land surveyor to the Engineer. <br /> B. On request of the Engineer, submit documentation to verify accuracy of field <br /> engineering work. <br /> C. Submit certificate signed by registered engineer or surveyor certifying that <br /> elevations and locations are in conformance or non-conformance, with Contract <br /> 1 Documents. <br /> PART 2 - PRODUCTS (Not Used) <br /> e PART 3 - EXECUTION (Not Used) <br /> END OF SECTION <br /> 1 05/08 01050-1 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.