My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> SECTION 01100 <br /> ALTERNATES <br /> PART 1 - GENERAL <br /> 1.01 REQUIREMENTS INCLUDED <br /> A. This section identifies procedures for proposing Alternates, and describes the <br /> basic changes to be incorporated into the Work, only when that Alternate is made <br /> a part of the Work by specific provisions in the Owner-Contractor Agreement. <br /> 1.02 RELATED REQUIREMENTS <br /> A. Bidding Documents: Method of quotation of the cost of each Alternate, and the <br /> basis of the Owner's acceptance of Alternates. <br /> B. Owner-Contractor Agreement: Incorporation of Alternates into the Work. <br /> C. Sections of the Specifications as listed under the respective Alternates. <br /> D. Referenced sections of Specifications stipulate pertinent requirements for products <br /> and methods to achieve the work stipulated under each Alternate. <br /> E. Coordinate pertinent related work and modify surrounding work as required to <br /> properly integrate the work under each Alternate, and to provide the complete <br /> construction required by Contract Documents. <br /> 1 1.03 PROCEDURES <br /> A. Alternates will be exercised at the option of the Owner. <br /> B. Coordinate related work and modify surrounding work as required to complete the <br /> Work, including changes under each Alternate, and to provide the complete <br /> construction required by Contract Documents. <br /> C. The Bidders may offer optional proposals in the part of the Bid form titled <br /> ' <br /> "Document 00400, Appendix C" for manufacturers and suppliers of equipment <br /> other than those required to be used in the base bid which they believe meets the <br /> Specifications for the Owner's consideration. After the Contract has been <br /> awarded, the Owner will determine whether any or all of the equipment options will <br /> be accepted and a Change Order will be issued to revise the contract price in the <br /> amount of the options desired. Offering an option shall bind the Contractor to <br /> accepting the Change Order, but the Owner is in no way bound to accept any <br /> option. If any option is offered, the model number and brand name must be <br /> submitted. <br /> 1 <br /> 05/08 01100-1 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.