Laserfiche WebLink
1 <br /> D. If an equipment option is proposed, the option price must reflect any additional <br /> installation and engineering costs required as a result of differences in equipment <br /> installation requirements. No extra cost will be paid to the Contractor for <br /> modification of concrete piping, electrical, etc., in the event the Owner elects to <br /> 1 accept an option. All revisions required shall be subject to the approval of the <br /> Engineer. <br /> PART 2 —PRODUCTS (Not Used) <br /> PART 3— EXECUTION (Not Used) <br /> 1 <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> ' 05/08 01100-2 05-4893 <br />