1 <br /> 1 <br /> 3. Suppliers as appropriate to the agenda. <br /> 4. Others as appropriate. <br /> 1 E. Suggested Agenda: <br /> 1. Review, approval of minutes of previous meeting. <br /> 2. Review of work progress since previous meeting. <br /> 3. Field observations, problems, conflicts. <br /> 1 4. Problems which impede Construction Schedule. <br /> 1 5. Review of off site fabrication, delivery schedule. <br /> 6. Corrective measures and procedures to regain projected schedule. <br /> 1 7. Revisions to Construction Schedule. <br /> 1 8. Progress, schedule, during succeeding work period. <br /> 9. Coordination of schedules. <br /> ' 10. Review submittal schedules; expedite as required. <br /> 1 11. Maintenance of quality standards. <br /> 12. Pending changes and substitutions. <br /> 13. Review proposed changes for: <br /> a. Effect on Construction Schedule and on a completion date. <br /> 1 b. Effect on other contracts of the Project. <br /> 14. Other business. <br /> 15. Construction schedule. <br /> 1 16. Critical/long lead items. <br /> F. The Contractor is to attend progress meetings and is to study previous meeting <br /> 1 minutes and current agenda items, in order to be prepared to discuss pertinent <br /> topics such as deliveries of materials and equipment, progress of work, etc. <br /> G. The Contractor is to provide a current submittal log at each progress meeting in <br /> 1 accordance with Section 01340. <br /> PART 2 - PRODUCTS (Not Used) <br /> 1 PART 3 - EXECUTION (Not Used) <br /> END OF DOCUMENT <br /> 1 05/08 01200-3 05-4893 <br />