Laserfiche WebLink
I <br /> B. Submittals Schedule for Shop Drawings, and Samples in accordance with <br /> Section 01340. Show: <br /> I1. The dates for Contractor's submittals. <br /> I 2. The dates submittals will be required for owner furnished products, if <br /> applicable. <br /> I3. The dates approved submittals will be required from the Engineer. <br /> C. A list of all long lead items (equipment, materials, etc). <br /> I1.05 PROGRESS REVISIONS <br /> A. Indicate progress of each activity to date of submission. <br /> 1 B. Show changes occurring since previous submission of schedule: <br /> I1. Major changes in scope. <br /> 2. Activities modified since previous submission. <br /> I3. Revised projections of progress and completion. <br /> I4. Other identifiable changes. <br /> C. Provide a narrative report as needed to define: <br /> I1. Problem areas, anticipated delays, and the impact on the schedule. <br /> 2. Corrective action recommended, and its effect. <br /> The effect of changes on schedules of other prime contractors. <br /> 1.06 SUBMISSIONS <br /> IA. Submit initial schedules to the Engineer within 10 days after the effective date of <br /> the Agreement. <br /> I1. The Engineer will review schedules and return review copy within 21 days <br /> after receipt. <br /> I2. If required, resubmit within 7 days after return of review copy. <br /> I B. Submit 5 copies of revised monthly progress schedules with that month's <br /> application for payment. <br /> I <br /> I <br /> I05/08 01310-3 05-4893 <br />