My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> SECTION 01340 <br /> SHOP DRAWINGS, WORKING DRAWINGS AND SAMPLES <br /> ' PART 1 - GENERAL <br /> 1.01 REQUIREMENTS INCLUDED <br /> A. The Contractor shall submit to the Engineer for review, such working drawings, <br /> shop drawings, test reports and data on materials and equipment (hereinafter in <br /> this article called data), and material samples (hereinafter in this article called <br /> samples) as are required for the proper control of work, including but not limited <br /> to those working drawings, shop drawings, data and samples for materials and <br /> equipment specified elsewhere in the Specifications and in the Contract <br /> Drawings. <br /> B. Within thirty (30) calendar days after the effective date of the Agreement, the <br /> ' Contractor shall submit to the Engineer a complete list of preliminary data for <br /> which Shop Drawings are to be submitted. Included in this list shall be the names <br /> of all proposed manufacturers furnishing specific items. Review of this list by the <br /> Engineer shall in no way expressed or implied relieve the Contractor from <br /> ' submitting complete Shop Drawings and providing materials, equipment, etc., <br /> fully in accordance with the Specifications. This procedure is required in order to <br /> expedite final review of Shop Drawings. <br /> ' C. The contractor is to maintain an accurate updated submittal log and will bring this <br /> log to each scheduled progress meeting with the Owner and Engineer. This log <br /> ' should include the following items: <br /> 1. Submittal-Description and Number assigned. <br /> 2. Date to Engineer. <br /> 1 3. Date returned to Contractor (from Engineer). <br /> 4. Status of Submittal (Approved/Resubmit/Rejected). <br /> 5. Date of Resubmittal and Return (as applicable). <br /> 6. Date material released (for fabrication). <br /> ' 7. Projected date of fabrication. <br /> • <br /> 1 8. Projected date of delivery to site. <br /> 1.02 RELATED REQUIREMENTS <br /> A. Section 01600: Material and Equipment <br /> B. Section 01720: Project Record Documents <br /> 1 <br /> ' 05/08 01340-1 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.