Laserfiche WebLink
1 <br /> C. Designate in the construction schedule, or in a separate coordinated schedule, <br /> the dates for submission and the dates that reviewed Shop Drawings, Working <br /> Drawings and Samples will be needed. <br /> 1.03 CONTRACTOR'S RESPONSIBILITY <br /> 1 A. It is the duty of the Contractor to check all drawings, data and samples prepared <br /> by or for him before submitting them to the Engineer for review. Each and every <br /> copy of the Drawings and data shall bear Contractor's stamp or will be returned to <br /> the Contractor for conformance with this requirement. Shop drawings shall <br /> indicate any deviations in the submittal from requirements of the Contract <br /> Documents. <br /> B. Determine and verify: <br /> 1. Field measurements <br /> 2. Field construction criteria <br /> 3. Catalog numbers and similar data <br /> 4. Conformance and Specifications <br /> C. The Contractor shall furnish the Engineer a schedule of Shop Drawing submittals <br /> fixing the respective dates for the submission of shop and working drawings, the <br /> beginning of manufacture, testing and installation of materials, supplies and <br /> equipment. This schedule shall indicate those that are critical to the progress <br /> schedule. <br /> D. The Contractor shall not begin any of the work covered by a drawing, data, or a <br /> sample returned for correction until a revision or correction thereof has been <br /> reviewed and returned to him, by the Engineer approved. <br /> E. The Contractor shall submit to the Engineer all drawings and schedules <br /> sufficiently in advance of construction requirements to provide no less than <br /> twenty-one (21) calendar days for checking and appropriate action from the time <br /> the Engineer receives them. <br /> F. The Contractor shall submit three (3) copies of descriptive or product data <br /> submittals to complement shop drawings for the Engineer plus the number of <br /> copies that the Contractor requires. The Engineer will retain three (3) sets. All <br /> blueprint shop drawings shall be submitted with one (1) set of reproducible and <br /> four (4) sets of print. The Engineer will review the drawings and return to the <br /> Contractor the set of marked-up drawings with appropriate review comments. <br /> G. The Contractor shall be responsible for and bear all cost of damages that may <br /> result from the ordering of any material or from proceeding with any part of work <br /> prior to the review by Engineer of the necessary Shop Drawings. <br /> 1 <br /> 05/08 01340-2 05-4893 <br />