My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.04 ENGINEER'S REVIEW OF SHOP DRAWINGS <br /> ' A. The Engineer's review of drawings, data and samples submitted by the <br /> Contractor will cover only general conformity to the Specifications, external <br /> connections, and dimensions that affect the installation. The Engineer's review <br /> ' and exceptions if any, will not constitute an approval of dimensions, quantities, <br /> and details of the material, equipment, device, or item shown. <br /> ' B. The review of drawings and schedules will be general, and shall not be <br /> construed: <br /> ' 1. As permitting any departure from the Contract requirements; <br /> 2. As relieving the Contractor of responsibility for any errors, including <br /> details, dimensions, and materials; <br /> 3. As approving departures from details furnished by the Engineer, except as <br /> otherwise provided herein. <br /> C. If the drawings or schedule as submitted describe variations per subparagraph <br /> (1.05.C), and show a departure from the Contract requirements which Engineers <br /> finds to be in the interest of the Owner and to be minor as not to involve a change <br /> in the Contract Price or time for performance, the Engineer may return the <br /> reviewed drawings without noting an exception. <br /> tD. When reviewed by the Engineer, each of the Shop Drawings will be identified as <br /> having received such review being so stamped and dated. Shop Drawings <br /> stamped "REJECTED" and with required corrections shown will be returned to <br /> tthe Contractor for correction and re-submittal. <br /> E. Re-submittals will be handled in the same manner as the first submittals. On <br /> resubmittals, the Contractor shall direct specific attention, in writing or on <br /> resubmitted Shop Drawings, to revisions other than the corrections requested by <br /> the Engineer on previous submissions. The Contractor shall make any <br /> corrections required by the Engineer. <br /> F. If the Contractor considers any correction indicated on the drawings to constitute <br /> a change to the Contract Drawings or Specifications, the Contractor shall give <br /> written notice thereof to the Engineer. <br /> G. The Engineer will review a submittal/resubmittal a maximum of three (3) times <br /> after which cost of review will be borne by the Contractor. The cost of <br /> engineering shall be equal to the Engineer's charges to the Owner under the <br /> terms of the Engineer's agreement with the Owner. <br /> H. When the Shop Drawings have been completed to the satisfaction of the <br /> Engineer, the Contractor shall carry out the construction in accordance therewith <br /> and shall make no further changes therein except upon written instructions from <br /> the Engineer. <br /> 1 <br /> e05/08 01340-3 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.