My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> No partial submittals will be reviewed. Submittals not complete will be returned to <br /> the Contractor, and will not be considered "Rejected" until resubmitted. <br /> 1.05 SHOP DRAWINGS <br /> A. When used in the Contract Documents, the term "Shop Drawings" shall be <br /> considered to mean Contractor's plans for material and equipment that become <br /> an integral part of the Project. These drawings shall be complete and detailed. <br /> 1 Shop Drawings shall consist of fabrication, erection and setting drawings and <br /> schedule drawings, manufacturer's scale drawings, and wiring and control <br /> diagrams. Cuts, catalogs, pamphlets, descriptive literature, and performance and <br /> test data, shall be considered only as supportive to required Shop Drawings as <br /> 1 defined above. <br /> B. Drawings and schedules shall be checked and coordinated with work of all trades <br /> involved, before they are submitted for review by the Engineer and shall bear the <br /> Contractor's stamp of approval as evidence of such checking and coordination. <br /> Drawings or schedules submitted without this stamp of approval shall be returned <br /> to the Contractor for resubmission. <br /> C. Each Shop Drawing, shall have a blank area 3 1/2 inches by 3 1/2 inches, located <br /> adjacent to the title block. The title block shall display the following: <br /> 1. Number and title of the drawing. <br /> 2. Date of drawing or revision. <br /> 3. Name of project building or facility. <br /> 4. Name of contractor and subcontractor submitting drawing. <br /> 5. Clear identification of contents and location of work. <br /> 6. Specification title and number. <br /> D. If drawings show variations from Contract requirements because of standard <br /> shop practice or for other reasons, the Contractor shall describe such variations <br /> in his letter of transmittal. If acceptable, proper adjustment in the Contract shall <br /> be implemented where appropriate. If the Contractor fails to describe such <br /> variations he shall not be relieved of the responsibility for executing the work in <br /> accordance with the Contract, even though such drawings have been reviewed. <br /> E. Data on materials and equipment include, without limitation, materials and <br /> equipment lists, catalog data sheets, cuts, performance curves, diagrams, <br /> materials of construction and similar descriptive material. Materials and <br /> equipment lists shall give, for each item thereon, the name and location of the <br /> supplier or manufacturer, trade name, catalog reference, size, finish and all other <br /> pertinent data. <br /> 1 F. For all mechanical and electrical equipment furnished, the Contractor shall <br /> provide a list including the equipment name, address and telephone number of <br /> the manufacturer's representative and service company so that service and spare <br /> parts can be readily obtained. In addition, a maintenance and lubrication <br /> schedule for each piece of equipment shall be submitted along with each shop <br /> drawing submittal. <br /> 1 <br /> e05/08 01340-4 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.