G. All manufacturers or equipment suppliers who propose to furnish equipment or <br /> products under Divisions 11, 13, 15 and 16 shall submit an installation list to the <br /> ' Engineer along with the required shop drawings. The installation list shall include <br /> at least five installations where identical equipment has been installed and has <br /> been in operation for a period of at least one (1) year. <br /> H. Only the Engineer will utilize the color"red" in marking Shop Drawing submittals. <br /> Before final payment is made, the Contractor shall furnish to Engineer two (2) <br /> ' sets of record shop drawings all clearly revised, complete and up to date showing <br /> the permanent construction as actually made for all reinforcing and structural <br /> steel, miscellaneous metals, process and mechanical equipment, yard piping, <br /> electrical system, instrumentation system and irrigation. <br /> 1.06 WORKING DRAWINGS <br /> A. When used in the Contract Documents, the term "working drawings" shall be <br /> considered to mean the Contractor's plans for temporary structures such as <br /> temporary bulkheads, support of open cut excavation, support of utilities, ground <br /> water control systems, forming and false-work; for underpinning; and for such <br /> other work as may be required for construction, but does not become an integral <br /> part of the project. <br /> 1 B. Copies of working drawings as noted in subparagraph 1.06A above, shall be <br /> submitted to the Engineer where required by the Contract Documents or <br /> requested by the Engineer, and shall be submitted at least thirty (30) calendar <br /> ' days (unless otherwise specified by the Engineer) in advance of their being <br /> required for work. <br /> C. Working drawings shall be signed by a Registered Professional Engineer, <br /> currently licensed to practice in the State of Florida and shall convey, or be <br /> accompanied by, calculation or other sufficient information to completely explain <br /> the structure, machine, or system described and its intended manner of use. <br /> Prior to commencing such work, working drawings must have been reviewed <br /> without specific exceptions by the Engineer, which review will be for general <br /> conformance and will not relieve the Contractor in any way from his responsibility <br /> with regard to the fulfillment of the terms of the Contract. All risks of error are <br /> assumed by the Contractor; the Owner and Engineer shall have no responsibility <br /> therefore. <br /> 1.07 1.07 SAMPLES <br /> 1 A. The Contractor shall furnish, for the approval of the Engineer, samples required <br /> by the Contract Documents or requested by the Engineer. Samples shall be <br /> delivered to the Engineer as specified or directed. The Contractor shall prepay all <br /> shipping charges on samples. Materials or equipment for which samples are <br /> required shall not be used in work until approved by the Engineer. <br /> ' B. Samples shall be of sufficient size and quantity to clearly illustrate: <br /> 1. Functional characteristics of the product, with integrally related parts and <br /> 1 attachment devices. <br /> 1 05/08 01340-5 05-4893 <br />