My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2. Full range of color, texture and pattern. <br /> 3. A minimum of two samples of each item shall be submitted. <br /> 1 C. Each sample shall have a label indicating <br /> 1. Name of Project <br /> 2. Name of Contractor and Subcontractor <br /> 3. Material or Equipment Represented <br /> 4. Place of Origin <br /> 5. Name of Producer and Brand (if any) <br /> 6. Location in Project <br /> (Samples of finished materials shall have additional marking that will identify them <br /> under the finished schedules.) <br /> D. The Contractor shall prepare a transmittal letter in triplicate for each shipment of <br /> samples containing the information required in subparagraph 1.07B above. He <br /> shall enclose a copy of this letter with the shipment and send a copy of this letter <br /> to the Engineer. Approval of a sample shall be only for the characteristics or use <br /> named in such approval and shall not be construed to change or modify any <br /> Contract requirements. <br /> ' E. Approved samples not destroyed in testing shall be sent to the Engineer or stored <br /> at the site of the work. Approved samples of the hardware in good condition will <br /> ' be marked for identification and may be used in the work. Materials and <br /> equipment incorporated in work shall match the approved samples. Samples <br /> which failed testing or were not approved samples will be returned to the <br /> 1 Contractor at his expense, if so requested at time of submission. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 1 <br /> 05/08 01340-6 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.