My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SECTION 01600 <br /> MATERIAL AND EQUIPMENT <br /> PART 1 - GENERAL <br /> 1.01 REQUIREMENTS INCLUDE <br /> 1 A. Material and equipment incorporated into the Work: <br /> 1. Conform to applicable specifications and standards. <br /> 2. Comply with size, make, type and quantity specified, or as specifically <br /> approved in writing by the Engineer. <br /> 3. Manufactured and Fabricated Products: <br /> a. Design, fabricate and assemble in accord with the best <br /> I <br /> b. engineering and shop practices. <br /> Manufacture like part of duplicate units to standard sizes and <br /> gauges, to be interchangeable. <br /> c. Two or more items of the same kind shall be identical, by the same <br /> manufacturer. <br /> d. Products shall be suitable for service conditions. <br /> e. Equipment capacities, sizes and dimensions shown or specified <br /> shall be adhered to unless variations are specifically approved in <br /> writing. <br /> 4. Do not use material or equipment for any purpose other than that for <br /> which it is designed or is specified. <br /> t1.02 RELATED REQUIREMENTS <br /> A. Section 01010: Summary of Work <br /> B. Section 01030: Special Project Procedures <br /> C. Section 01340: Shop Drawings, Working Drawings and Samples <br /> D. Section 01720: Project Record Documents <br /> 1.03 APPROVAL OF MATERIALS <br /> A. Only new materials and equipment shall be incorporated in the work. All <br /> materials and equipment furnished by the Contractor shall be subject to the <br /> inspection and approval of the Engineer. No material shall be delivered to the <br /> work without prior approval of the Engineer. <br /> B. Within 30 days after the effective date of the Agreement, the Contractor shall <br /> submit to the Engineer, data relating to materials and equipment he proposes to <br /> furnish for the work. Such data shall be in sufficient detail to enable the Engineer <br /> 05/08 01600-1 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.