My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> to identify the particular product and to form an opinion as to its conformity to the <br /> specifications. The data shall comply with Paragraph 1.07 of this Section. <br /> C. Facilities and labor for handling and inspection of all materials and equipment <br /> shall be furnished by the Contractor. If the Engineer requires, either prior to <br /> beginning or during progress of the work, the Contractor shall submit samples of <br /> materials for such special tests as may be necessary to demonstrate that they <br /> conform to the specifications. Such samples shall be furnished, stored, packed, <br /> and shipped as directed at the Contractor's expense. <br /> D. The Contractor shall submit data and samples sufficiently early to permit <br /> consideration and approval before materials are necessary for incorporation in <br /> the work. Any delay of approval resulting from the Contractor's failure to submit <br /> samples or data promptly shall not be used as a basis of claim against the Owner <br /> or the Engineer. <br /> aE. In order to demonstrate the proficiency of workmen or to facilitate the choice <br /> among several textures, types, finishes, and surfaces, the Contractor shall <br /> provide such samples of workmanship or finish as may be required. <br /> F. The materials and equipment used on the work shall correspond to the approved <br /> samples or other data. <br /> 1.04 MANUFACTURER'S INSTRUCTIONS FOR INSTALLATION <br /> A. When Contract Documents require that installation of work shall comply with <br /> manufacturer's printed instruction, obtain and distribute copies of such <br /> instructions to parties involved in the installation, including copies to the Engineer. <br /> 1. Maintain one set of complete instructions at the job site during installation <br /> and until completion. <br /> B. Handle, install, connect, clean, condition and adjust products in strict accord with <br /> such instructions and in conformity with specified requirements. <br /> 1. Should job conditions or specified requirements conflict with <br /> manufacturer's instructions, consult with Engineer for further instructions. <br /> 2. Do not proceed with work without clear instructions. <br /> C. Perform work in accord with manufacturer's instructions. Do not omit any <br /> preparatory step or installation procedure unless specifically modified or <br /> exempted by Contract Documents. <br /> 1.05 TRANSPORTATION AND HANDLING <br /> A. Arrange deliveries of Products in accord with construction schedules, coordinate <br /> to avoid conflict with work and conditions at the site. <br /> 1. Deliver Products in undamaged condition, in manufacturer's original <br /> containers or packaging, with identifying labels intact and legible. <br /> 05/08 01600-2 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.