My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> SECTION 01701 <br /> PROJECT CLOSEOUT <br /> PART 1 - GENERAL <br /> 1.01 RELATED REQUIREMENTS <br /> ' A. General provisions of Contract, including General and Supplementary Conditions. <br /> B. Warranty and bond submittal. <br /> C. Closeout submittals, warranties and bonds required for specific products of work. <br /> 1.02 SECTION INCLUDES <br /> A. Administrative and procedural requirements for project closeout. <br /> 1. Inspection procedures. <br /> 2. Project record document submittal. <br /> 3. Final cleaning. <br /> 1.03 SUBSTANTIAL COMPLETION <br /> A. Before requesting inspection for certification of Substantial Completion, complete <br /> the following. List exceptions in the request. <br /> 1. If 100 percent completion cannot be shown, include a list of incomplete <br /> items, the value of incomplete construction, and reasons the Work is not <br /> complete. <br /> 2. Advise Owner of pending insurance change-over requirements. <br /> 3. Submit specific warranties, workmanship bonds, maintenance <br /> 1 agreements, final certifications and similar documents. <br /> 4. Obtain and submit releases enabling the Owner unrestricted use of the <br /> Work and access to services and utilities; include occupancy permits, <br /> 1 <br /> 5. operating certificates and similar releases. <br /> Submit record drawings, maintenance manuals, and similar final record <br /> information. <br /> 6. Complete start-up testing of systems, and instruction of the Owner's <br /> operating and maintenance personnel. Discontinue or change over and <br /> remove temporary facilities from the site, along with construction tools, <br /> mock-ups, and similar elements. <br /> B. When the Contractor considers the Work to be substantially complete, he shall <br /> submit a written notice to the Engineer that the Work, or designated portion of the <br /> Work, is complete and ready for inspection. <br /> C. Within a reasonable time of receipt of a request for inspection, the Engineer will <br /> either proceed with inspection or advise the Contractor of unfulfilled <br /> requirements. When the Engineer and Owner concur that the Work, or <br /> designated portion of the Work, is substantially complete, the Engineer will <br /> 1 prepare the Certificate of Substantial Completion following inspection. <br /> 05/08 01701-1 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.