Laserfiche WebLink
1.08 SPECIAL TOOLS <br /> A. Manufacturers of equipment and machinery shall furnish any special tools <br /> (including grease guns or other lubricating devices) required for normal <br /> adjustment, operations and maintenance, together with instructions for their use. <br /> 1 The Contractor shall preserve and deliver to the Owner these tools and <br /> instructions in good order no later than upon completion of the Contract. <br /> t1.09 WARRANTY <br /> A. For all major pieces of equipment, submit a warranty from the equipment <br /> manufacturer. <br /> 1.10 SPARE PARTS <br /> A. Spare parts for certain equipment provided under Division 11 through 16 have <br /> been specified in the pertinent sections of the Specifications. The Contractor <br /> shall collect and store all spare parts so required in an area to be designated by <br /> ' the Engineer. In addition, the Contractor shall furnish to the Engineer an <br /> inventory listing all spare parts, the equipment they are associated with, the name <br /> and address of the supplier, and the delivered cost of each item. Copies of actual <br /> ' invoices for each item shall be furnished with the inventory to substantiate the <br /> delivered cost. <br /> ' 1.11 GREASE, OIL AND FUEL <br /> A. All grease, oil and fuel required for testing of equipment shall be furnished with <br /> 1 the respective equipment. The Owner shall be furnished with a year's supply of <br /> required lubricants including grease and oil of the type recommended b the <br /> manufacturer with each item of the equipment supplied under Division 11 through <br /> 16. <br /> B. The Contractor shall be responsible for changing the oil in all drives and <br /> intermediate drives of each mechanical equipment after initial break-in of the <br /> equipment, which in no event shall be any longer than three weeks of operation. <br /> PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 05/08 01600-6 05-4893 <br />