Laserfiche WebLink
I <br /> 1 2. For Products specified by naming several products or manufacturers, <br /> I select any one of the products or manufacturers named, which complies <br /> with the specifications. <br /> 3. For products specified by naming one or more Products or manufacturers <br /> and "or equal", Contractor must submit a request as for substitutions for <br /> Iany Product or manufacturer not specifically named. <br /> C. Substitutions: <br /> I1. For a period of 30 days after the effective date of the Agreement, the <br /> Engineer will consider written requests from Contractor for substitution of <br /> IProducts. <br /> 2. Submit a separate request for each Product, supported with complete <br /> data, with drawings and samples as appropriate, including: <br /> Ia. Comparison of the qualities of the proposed substitution with that <br /> specified <br /> I b. Changes required in other elements of the work because of the <br /> substitution <br /> c. Effect on the construction schedule <br /> I d. Cost data comparing the proposed substitution with the Product <br /> specified <br /> e. Any required license fees or royalties <br /> I f. Availability of maintenance service, and source of replacement <br /> materials <br /> 3. The Engineer shall be the judge of the acceptability of the proposed <br /> Isubstitution. <br /> 4. No substitutions will be considered by the Engineer after 30 days from the <br /> IContract Date. <br /> D. Contractor's Representation: <br /> I1. A request for a substitution constitutes a representation that Contractor: <br /> I a. Has investigated the proposed Product and determined that it is <br /> equal to or superior in all respects to that specified <br /> b. Will provide the same warranties or bonds for the substitution as <br /> I c. for the Product specified <br /> Will coordinate the installation of an accepted substitution into the <br /> Work, and make such other changes as may be required to make <br /> the Work complete in all respects <br /> Id. Waives all claims for additional costs, under his responsibility, <br /> which may subsequently become apparent. <br /> I E. The Engineer will review requests for substitutions with reasonable promptness, <br /> and notify Contractor, in writing, of the decision to accept or reject the requested <br /> substitution. <br /> I <br /> I05/08 01600-5 05-4893 <br />