My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N <br /> E. Moving parts shall be rotated a minimum of once weekly to insure proper <br /> lubrications and to avoid metal-to-metal "welding". Upon installation of the <br /> equipment, the Contractor shall start the equipment, at least half load, once <br /> weekly for an adequate period of time to insure that the equipment does not <br /> deteriorate from lack of use. <br /> F. All materials which, in the opinion of the Engineer, have become so damaged as <br /> to be unfit for the use intended or specified shall be promptly removed from the <br /> site of the work, and the Contractor shall receive no compensation for the <br /> damaged material or its removal. <br /> G. Arrange storage in a manner to provide easy access for inspection. Make <br /> ' periodic inspections of stored Products to assure that Products are maintained <br /> under specific conditions, and free from damage or deterioration. <br /> H. Protection After Installation: <br /> 1. Provide substantial coverings as necessary to protect installed products <br /> from damage from traffic and subsequent construction operations. <br /> Remove covering when no longer needed. <br /> 1 I. The Contractor shall be responsible for all materials, equipment, and supplies <br /> sold and delivered to the Owner under this Contract until final inspection of the <br /> work and acceptance thereof by the Owner. In the event any such material, <br /> equipment, and supplies are lost, stolen, damaged, or destroyed prior to final <br /> inspection and acceptance, the Contractor shall replace same without additional <br /> cost to the Owner. <br /> 1 J. Should the Contractor fail to take proper action on storage and handling of <br /> equipment supplied under this Contract within seven days after written notice to <br /> do so has been given, the Owner retains the right to correct all deficiencies noted <br /> in previously transmitted written notice and debit the cost associated with these <br /> corrections from the Contractor's Contract. These costs may be comprised of <br /> expenditures for labor, equipment usage, administrative, clerical, engineering and <br /> 1 any other costs associated with making the necessary corrections. <br /> 1.07 SUBSTITUTIONS AND PRODUCT OPTIONS <br /> A. Products List: <br /> 1. Within 30 days after the effective date of the Agreement, submit to the <br /> Engineer a complete list of major products proposed to be used, with the <br /> name of the manufacturer and the installing subcontractor. <br /> B. Contractor's Options: <br /> 1. For Products specified only by reference standard, select any product <br /> meeting that standard. <br /> I <br /> 05/08 01600-4 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.