Laserfiche WebLink
1 <br /> F. Miscellaneous Record Submittals: Refer to other Specification Sections for <br /> 1 requirements of miscellaneous record-keeping and submittals in connection with <br /> actual performance of the Work. <br /> G. At Contract close-out, deliver one copy of Record Documents to Engineer for <br /> Owner. Accompany submittal with transmittal letter in duplicate containing the <br /> following information: <br /> 1. Date. <br /> 2. Project title and number. <br /> 3. Contractor's name and address. <br /> 4. Title and number of each Record Document. <br /> 5. Signature of Contractor or his authorized representative. <br /> PART 2 - PRODUCTS (Not Applicable) <br /> PART 3 - EXECUTION <br /> 3.01 FINAL CLEANING <br /> A. Remove temporary protection and facilities installed for protection of the Work <br /> during construction. <br /> B. Comply with regulations of authorities having jurisdiction and safety standards for <br /> cleaning. Do not burn waste materials. Do not bury debris or excess materials <br /> on the Owner's property. Do not discharge volatile, harmful or dangerous <br /> materials into drainage systems. Remove waste materials from the site and <br /> dispose of in a lawful manner. <br /> C. Where extra materials of value remaining after completion of associated Work <br /> have become the Owner's property, arrange for disposition of these materials as <br /> directed. <br /> END OF SECTION <br /> • <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 05/08 01701-4 05-4893 <br />