My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I <br /> a. Routine and normal operating instructions <br /> I b. Sequences required <br /> c. Special operating instructions <br /> I5. Maintenance procedures: <br /> a Routine operations <br /> b. Guide to "trouble-shooting" <br /> c. Disassembly, repair and reassembly <br /> d. Adjustment and checking <br /> I6. Manufacturer's printed operating and maintenance instructions <br /> 7. List of original manufacturer's spare parts, manufacturer's current prices, <br /> Iand recommended quantities to be maintained in storage. <br /> 8. Other data as required under pertinent sections of specifications <br /> D. Prepare and include additional data when the need for such data becomes <br /> apparent during instruction of Owner's personnel. <br /> IE. Additional requirements for operating and maintenance data: Respective <br /> sections of Specifications. <br /> F. Provide complete information for product specified. <br /> I1.08 SUBMITTAL SCHEDULE <br /> A. Submit two copies of preliminary draft of proposed formats and outlines of <br /> I contents of Operation and Maintenance Manuals within 30 days after Notice to <br /> Proceed. <br /> I 1. The Engineer will review the preliminary draft and return one copy with <br /> comments. <br /> 1 B. Submit two copies of completed data in final form no later than 30 days following <br /> the Engineer's review of the last shop drawing and submittal specified under <br /> Section 01340. <br /> 1 1. One copy will be returned with comments to be incorporated into final <br /> copies. <br /> 1 C. Submit specified number of copies of approved data in final form directly to the <br /> offices of the Engineer, Calvin, Giordano within 30 calendar days of product <br /> shipment to the project site and preferably within 30 days after the reviewed copy <br /> Iis received. <br /> D. Submit six copies of addendum to the operation and maintenance manuals as <br /> 1 applicable and certificates as specified in paragraph 1.01B of Section 01030 <br /> 1 05/08 01730-6 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.