Laserfiche WebLink
1 <br /> within 30 days after final inspection and plant start-up test. <br /> E. Final Operation and Maintenance submittals shall be in large three ring binders <br /> organized by specification Section and plainly marked per paragraph 1.04(C). <br /> 1.09 INSTRUCTION OF OWNER'S PERSONNEL <br /> A. Prior to final inspection or acceptance, fully instruct Owner's designated <br /> operating and maintenance personnel in operation, adjustment and maintenance <br /> of products, equipment and systems. <br /> B. Operating and maintenance manual shall constitute the basis of instruction. <br /> 1. Review contents of manual with personnel in full detail to explain all <br /> aspects of operations and maintenance. <br /> 1.10 ENGINEER'S 0 & M CHECKLIST <br /> A. The Engineer will review Operation and Maintenance Manuals submittals on <br /> operating equipment for conformance with the requirements of this Section. The <br /> review will generally be based upon the checklist presented on the following <br /> pages (Table 01730) for the benefit of the Contractor and his suppliers. <br /> 1 PART 2 - PRODUCTS (Not Used) <br /> PART 3 - EXECUTION (Not Used) <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 05/08 01730-7 05-4893 <br />