Laserfiche WebLink
1 <br /> TABLE 01730 <br /> 0 & M REVIEW CHECKLIST <br /> EQUIPMENT SUBMITTED DATE OF SUBMITTAL <br /> MANUFACTURER DEGREE OF APPROVAL <br /> eSPECIFICATION SECTION DRAWING NUMBER <br /> Is submittal correct for model/series/configuration originally submitted with shop <br /> drawings? <br /> Is binding correct with assigned color/printing etc.? <br /> (Pertains to final three volumes) <br /> Is submittal properly indexed? <br /> Does submittal pertain only to equipment being furnished? <br /> Is submittal easily understood and instructively arranged? <br /> Does submittal include start-up, shutdown and trouble-shooting procedures? <br /> Are sufficient drawings and schematics included to supplement written descriptions? <br /> Is listing of name plate data for each piece of equipment supplied provided and attached? <br /> Are all drawings provided printed on paper which is 11 inches high and folded to 8 1/2 <br /> inches wide? <br /> Is proper and complete instruction for servicing included? <br /> Is there a suggested operating log sheet for equipment? <br /> Is schedule for lubrication provided? <br /> Is there a recommended preventative maintenance schedule? <br /> Are necessary safety precautions clearly indicated where they relate to the equipment? <br /> Is area representative information provided, i.e., Name, Address, Telephone Number? <br /> Are specified spare parts indicated and listed? <br /> The following are points of rejection necessitating resubmittal by Contractor: <br /> END OF SECTION <br /> 1 <br /> e05/08 01730-8 05-4893 <br />