My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 3.02 REFILL <br /> A. If the material at the level of trench bottom consists of fine sand or sand and silt <br /> which may work into the drain rock prohibiting effective drainage, the sub-grade <br /> material shall be removed to the extent directed and the excavation refilled with <br /> coarse sand, or a mixture graded from coarse sand to fine pea-stone, to form a <br /> 1 filter layer preserving the voids in the gravel bed of the pipe. The composition and <br /> gradation of gravel shall be approved by the Engineer prior to placement. Gravel <br /> shall be placed in 6 inch layers thoroughly compacted to 90 percent of maximum <br /> standard proctor density. If directed by the Engineer, drain rock shall be used for <br /> 1 refill of excavation below grade. <br /> END OF SECTION <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 05/08 02223-2 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.