Laserfiche WebLink
I <br /> SECTION 02223 <br /> 0 EXCAVATION BELOW NORMAL GRADE AND GRAVEL REFILL <br /> 1 PART 1 - GENERAL <br /> 1.01 SCOPE OF WORK <br /> A. If in the opinion of the Engineer, the material at or below the normal grade of the <br /> bottom of the trench (0.7 feet below the invert of the pipe) is unsuitable for <br /> foundation, it shall be removed to the depth directed by the Engineer and replaced <br /> by drain rock, as specified in Section 02221 - Trenching, Bedding, and Backfill for <br /> Pipe. <br /> B. It shall be the Contractor's responsibility to provide trench safety systems such as <br /> sheeting and bracing in accordance with state and local regulations. <br /> 1.02 RELATED WORK <br /> 1 A. Section 02221: Trenching, Bedding and Backfill for Pipe. <br /> PART 2 - PRODUCTS <br /> 2.01 MATERIALS <br /> A. Drain rock shall be 3/4 inch washed and graded limerock. The rock shall be graded <br /> so that 99% will pass a 3/4 inch screen and 80% will be retained on a No. 8 <br /> screen. Material meeting the Florida Department of Transportation Standard <br /> Specifications for No. 57 stone shall be acceptable. <br /> PART 3 - EXECUTION <br /> 3.01 EXCAVATION AND DRAINAGE <br /> A. Whatever the nature of unstable material encountered or the groundwater <br /> conditions, trench drainage shall be complete and effective. <br /> B. If the Contractor excavates below grade through error or for his own convenience, <br /> or through failure to properly dewater the trench, or disturbs the sub-grade before <br /> dewatering is sufficiently complete, he may be directed by the Engineer to <br /> excavate below grade as set forth in the preceding paragraph, in which case the <br /> work of excavating below grade and finishing and placing the refill shall be <br /> performed at his own expense. <br /> 1 <br /> 1 05/08 02223-1 05-4893 <br />