My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> GENERAL CONDITIONS Contractor and Owner and authorizes an addition, <br /> 1 ARTICLE 1 - DEFINITIONS AND TERMINOLOGY deletion, or revision in the Work or an adjustment in <br /> the Contract Price or the Contract Times, issued on <br /> or after the Effective Date of the Agreement. <br /> I1.01 Defined Terms 10. Claim--A demand or assertion by Owner <br /> or Contractor seeking an adjustment of Contract <br /> A. Wherever used in the Bidding Price or Contract Times, or both, or other relief with <br /> I Requirements or Contract Documents and printed respect to the terms of the Contract. A demand for <br /> with initial capital letters, the terms listed below will money or services by a third party is not a Claim. <br /> have the meanings indicated which are applicable to <br /> I both the singular and plural thereof. In addition to 11. Contract--The entire and integrated <br /> terms specifically defined, terms with initial capital written agreement between the Owner and <br /> letters in the Contract Documents include references Contractor concerning the Work. The Contract <br /> to identified articles and paragraphs, and the titles of supersedes prior negotiations, representations, or <br /> 1 other documents or forms. agreements, whether written or oral. <br /> 1. Addenda—Written or graphic instruments 12. Contract Documents— Those items so <br /> I issued prior to the opening of Bids which clarify, designated in the Agreement. Only printed or hard <br /> correct, or change the Bidding Requirements or the copies of the items listed in the Agreement are <br /> proposed Contract Documents. Contract Documents. Approved Shop Drawings, <br /> other Contractor's submittals, and the reports and <br /> 1 2. Agreement--The written instrument which drawings of subsurface and physical conditions are <br /> is evidence of the agreement between Owner and not Contract Documents. <br /> Contractor covering the Work. <br /> 13. Contract Price—The moneys payable by <br /> 3. Application for Payment—The form Owner to Contractor for completion of the Work in <br /> acceptable to Engineer which is to be used by accordance with the Contract Documents as stated <br /> Contractor during the course of the Work in in the Agreement (subject to the provisions of <br /> I requesting progress or final payments and which is Paragraph 11.03 in the case of Unit Price Work). <br /> to be accompanied by such supporting <br /> documentation as is required by the Contract 14. Contract Times—The number of days or <br /> I Documents. the dates stated in the Agreement to: (i) achieve <br /> Milestones, if any, (ii) achieve Substantial <br /> 4. Asbestos--Any material that contains Completion; and (iii) complete the Work so that it is <br /> more than one percent asbestos and is friable or is ready for final payment as evidenced by Engineer's <br /> I releasing asbestos fibers into the air above current written recommendation of final payment. <br /> action levels established by the United States <br /> Occupational Safety and Health Administration. 15. Contractor--The individual or entity with <br /> whom Owner has entered into the Agreement. <br /> 5. Bid—The offer or proposal of a Bidder <br /> submitted on the prescribed form setting forth the 16. Cost of the Work—See Paragraph <br /> prices for the Work to be performed. 11.01.A for definition. <br /> I6. Bidder—The individual or entity who 17. Drawings—That part of the Contract <br /> submits a Bid directly to Owner. Documents prepared or approved by Engineer <br /> I which graphically shows the scope, extent, and <br /> 7. Bidding Documents--The Bidding character of the Work to be performed by <br /> Requirements and the proposed Contract Contractor. Shop Drawings and other Contractor <br /> Documents (including all Addenda). submittals are not Drawings as so defined. <br /> I8. Bidding Requirements--The 18. Effective Date of the Agreement--The <br /> Advertisement or Invitation to Bid, Instructions to date indicated in the Agreement on which it <br /> I Bidders, bid security of acceptable form, if any, and <br /> the Bid Form with any supplements. becomes effective, but if no such date is indicated, it <br /> means the date on which the Agreement is signed <br /> and delivered by the last of the two parties to sign <br /> 9. Change Order--A document and deliver. <br /> 1 recommended by Engineer which is signed by <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright C 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> S 00700.5 <br /> 04108 Final Version 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.