<br /> 19. Engineer—The individual or entity named 31. Petroleum—Petroleum, including crude
<br /> I as such in the Agreement. oil or any fraction thereof which is liquid at standard
<br /> conditions of temperature and pressure (60 degrees
<br /> 20. Field Order—A written order issued by Fahrenheit and 14.7 pounds per square inch
<br /> Engineer which requires minor changes in the Work absolute), such as oil, petroleum, fuel oil, oil sludge,
<br /> 1 but which does not involve a change in the Contract
<br /> Price or the Contract Times. oil refuse, gasoline, kerosene, and oil mixed with
<br /> other non-Hazardous Waste and crude oils.
<br /> 21. General Requirements--Sections of 32. Progress Schedule—A schedule,
<br /> Division 1 of the Specifications. The General prepared and maintained by Contractor, describing
<br /> Requirements pertain to all sections of the Specifics- the sequence and duration of the activities
<br /> lions. comprising the Contractor's plan to accomplish the
<br /> I Work within the Contract Times.
<br /> 22. Hazardous Environmental Condition—
<br /> The presence at the Site of Asbestos, PCBs, Petro- 33. Project—The total construction of which
<br /> leum, Hazardous Waste, or Radioactive Material in the Work to be performed under the Contract
<br /> such quantities or circumstances that may present a Documents may be the whole, or a part.
<br /> substantial danger to persons or property exposed
<br /> thereto in connection with the Work. 34. Project Manual—The bound
<br /> documentary information prepared for bidding and
<br /> 23. Hazardous Waste—The term Hazardous constructing the Work. A listing of the contents of the
<br /> Waste shall have the meaning provided in Section Project Manual, which may be bound in one or more
<br /> I 1004 of the Solid Waste Disposal Act (42 USC volumes, is contained in the table(s)of contents.
<br /> Section 6903) as amended from time to time.
<br /> 35. Radioactive Material--Source, special
<br /> 24. Laws and Regulations; Laws or Regulat- nuclear, or byproduct material as defined by the
<br /> I ions—Any and all applicable laws, rules, regulations, Atomic Energy Act of 1954 (42 USC Section 2011 et
<br /> ordinances, codes, and orders of any and all govern- seq.) as amended from time to time.
<br /> mental bodies, agencies, authorities, and courts
<br /> I having jurisdiction. 36. Related Entity — An officer, director,
<br /> partner, employee, agent, consultant, or
<br /> 25. Liens—Charges, security interests, or subcontractor.
<br /> encumbrances upon Project funds, real property, or
<br /> I personal property. 37. Resident Project Representative—The
<br /> authorized representative of Engineer who may be
<br /> 26. Milestone—A principal event specified in assigned to the Site or any part thereof.
<br /> the Contract Documents relating to an intermediate
<br /> completion date or time prior to Substantial Comple- 38. Samples--Physical examples of
<br /> lion of all the Work. materials, equipment, or workmanship that are
<br /> representative of some portion of the Work and
<br /> I 27. Notice of Award—The written notice by which establish the standards by which such portion
<br /> Owner to the Successful Bidder stating that upon of the Work will be judged.
<br /> timely compliance by the Successful Bidder with the
<br /> conditions precedent listed therein, Owner will sign 39. Schedule of Submittals—A schedule,
<br /> Iand deliver the Agreement. prepared and maintained by Contractor, of required
<br /> submittals and the time requirements to support
<br /> 28. Notice to Proceed--A written notice given scheduled performance of related construction
<br /> I by Owner to Contractor fixing the date on which the activities.
<br /> Contract Times will commence to run and on which
<br /> Contractor shall start to perform the Work under the 40. Schedule of Values—A schedule,
<br /> I Contract Documents. prepared and maintained by Contractor, allocating
<br /> portions of the Contract Price to various portions of
<br /> 29. Owner—The individual or entity with the Work and used as the basis for reviewing
<br /> whom Contractor has entered into the Agreement Contractor's Applications for Payment.
<br /> 1 and for whom the Work is to be performed.
<br /> 41. Shop Drawings—All drawings, diagrams,
<br /> 30. PCBs—Polychlorinated biphenyls. illustrations, schedules, and other data or
<br /> Iinformation which are specifically prepared or
<br /> EJCDC C-700 Standard General Conditions of the Construction Contract.