My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Iplaced, the moneys so received applied on account consent by endorsement on the policy or policies, <br /> thereof, and the Work and the cost thereof covered but the property insurance shall not be canceled or <br /> I by an appropriate Change Order . permitted to lapse on account of any such partial <br /> use or occupancy. <br /> B. Owner as fiduciary shall have power to <br /> adjust and settle any loss with the insurers unless <br /> one of the parties in interest shall object in writing ARTICLE 6 -CONTRACTOR'S RESPONSIBILITIES <br /> within 15 days after the occurrence of loss to <br /> Owner's exercise of this power. If such objection be <br /> I made, Owner as fiduciary shall make settlement with 6.01 Supervision and Superintendence <br /> the insurers in accordance with such agreement as <br /> the parties in interest may reach. If no such A. Contractor shall supervise, inspect, and <br /> 1 agreement among the parties in interest is reached, direct the Work competently and efficiently, devoting <br /> Owner as fiduciary shall adjust and settle the loss such attention thereto and applying such skills and <br /> with the insurers and, if required in writing by any expertise as may be necessary to perform the Work <br /> party in interest, Owner as fiduciary shall give bond in accordance with the Contract Documents. <br /> I for the proper performance of such duties. Contractor shall be solely responsible for the means, <br /> methods, techniques, sequences, and procedures of <br /> 5.09 Acceptance of Bonds and Insurance; Option construction. Contractor shall not be responsible for <br /> I to Replace the negligence of Owner or Engineer in the design <br /> or specification of a specific means, method, tech- <br /> A. If either Owner or Contractor has any nique, sequence, or procedure of construction which <br /> objection to the coverage afforded by or other provi- is shown or indicated in and expressly required by <br /> I sions of the bonds or insurance required to be the Contract Documents. <br /> purchased and maintained by the other party in <br /> accordance with Article 5 on the basis of B. At all times during the progress of the <br /> I non-conformance with the Contract Documents, the Work, Contractor shall assign a competent resident <br /> objecting party shall so notify the other party in superintendent who shall not be replaced without <br /> writing within 10 days after receipt of the certificates written notice to Owner and Engineer except under <br /> (or other evidence requested) required by Paragraph extraordinary circumstances. The superintendent will <br /> I 2.01.B. Owner and Contractor shall each provide to <br /> the other such additional information be Contractor's representative at the Site and shall <br /> tion in respect of have authority to act on behalf of Contractor. All <br /> insurance provided as the other may reasonably communications given to or received from the <br /> request. If either party does not purchase or superintendent shall be binding on Contractor. <br /> maintain all of the bonds and insurance required of <br /> such party by the Contract Documents, such party 6.02 Labor; Working Hours <br /> shall notify the other party in writing of such failure to <br /> I purchase prior to the start of the Work, or of such A Contractor shall provide competent, <br /> failure to maintain prior to any change in the suitably qualified personnel to survey and lay out the <br /> required coverage. Without prejudice to any other Work and perform construction as required by the <br /> I right or remedy, the other party may elect to obtain Contract Documents. Contractor shall at all times <br /> equivalent bonds or insurance to protect such other maintain good discipline and order at the Site. <br /> party's interests at the expense of the party who was <br /> required to provide such coverage, and a Change B. Except as otherwise required for the <br /> I Order shall be issued to adjust the Contract Price <br /> accordingly. safety or protection of persons or the Work or <br /> property at the Site or adjacent thereto, and except <br /> as otherwise stated in the Contract Documents, all <br /> I 5.10 Partial Utilization, Acknowledgment of Work at the Site shall be performed during regular <br /> Property Insurer working hours. Contractor will not permit the <br /> performance of Work on a Saturday, Sunday, or any <br /> A. If Owner finds it necessary to occupy or legal holiday without Owner's written consent (which <br /> I use a portion or portions of the Work prior to Sub- will not be unreasonably withheld) given after prior <br /> stantial Completion of all the Work as provided in written notice to Engineer. <br /> Paragraph 14.05, no such use or occupancy shall <br /> I commence before the insurers providing the 6.03 Services, Materials, and Equipment <br /> property insurance pursuant to Paragraph 5.06 have <br /> acknowledged notice thereof and in writing effected A. Unless otherwise specified in the <br /> any changes in coverage necessitated thereby. The Contract Documents, Contractor shall provide and <br /> I insurers providing the property insurance shall <br /> EJCDC C-700 Standard General Conditions assu of the m e Construction full Contraresponsibility for all services, materials,ct. <br /> Copyright 02002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700-18 <br /> I <br /> 04/08 Final Version 054893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.