Laserfiche WebLink
I <br /> equipment, labor, transportation, construction other Suppliers may be submitted to Engineer for <br /> I equipment and machinery, tools, appliances, fuel, review under the circumstances described below. <br /> power, light, heat, telephone, water, sanitary <br /> facilities, temporary facilities, and all other facilities 1. "Or-Equal" Items: If in Engineer's sole <br /> and incidentals necessary for the performance, discretion an item of material or equipment proposed <br /> I testing, start-up, and completion of the Work. by Contractor is functionally equal to that named and <br /> sufficiently similar so that no change in related Work <br /> B. All materials and equipment incorporated will be required, it may be considered by Engineer <br /> I into the Work shall be as specified or, if not as an "or-equal" item, in which case review and <br /> specified, shall be of good quality and new, except approval of the proposed item may, in Engineer's <br /> as otherwise provided in the Contract Documents. sole discretion, be accomplished without compliance <br /> All special warranties and guarantees required by with some or all of the requirements for approval of <br /> I the Specifications shall expressly run to the benefit proposed substitute items. For the purposes of this <br /> of Owner. If required by Engineer, Contractor shall Paragraph 6.05.A.1, a proposed item of material or <br /> furnish satisfactory evidence (including reports of equipment will be considered functionally equal to <br /> I required tests) as to the source, kind, and quality of an item so named if: <br /> materials and equipment. <br /> a. in the exercise of reasonable judgment <br /> C. All materials and equipment shall be Engineer determines that: <br /> I stored, applied, installed, connected, erected, <br /> protected, used, cleaned, and conditioned in 1) it is at least equal in materials of <br /> accordance with instructions of the applicable construction, quality, durability, appearance, <br /> I Supplier, except as otherwise may be provided in strength, and design characteristics; <br /> the Contract Documents. <br /> 2) it will reliably perform at least <br /> 6.04 Progress Schedule equally well the function and achieve the <br /> I results imposed by the design concept of the <br /> A. Contractor shall adhere to the Progress completed Project as a functioning whole, <br /> Schedule established in accordance with Paragraph <br /> I 2.07 as it may be adjusted from time to time as 3) it has a proven record of <br /> provided below. performance and availability of responsive <br /> service; and <br /> 1. Contractor shall submit to Engineer for <br /> acceptance (to the extent indicated in Paragraph b. Contractor certifies that, if approved and <br /> 2.07) proposed adjustments in the Progress incorporated into the Work: <br /> Schedule that will not result in changing the Contract <br /> I Times. Such adjustments will comply with any provi- 1) there will be no increase in cost <br /> to the Owner of the General Requirements applicable there- wner or increase in Contract Times, <br /> to. and <br /> 1 2. Proposed adjustments in the Progress 2) it will conform substantially to the <br /> Schedule that will change the Contract Times shall detailed requirements of the item named in <br /> be submitted in accordance with the requirements of the Contract Documents. <br /> 1 Article 12. Adjustments in Contract Times may only <br /> be made by a Change Order. 2. Substitute Items <br /> 6.05 Substitutes and "Or-Equals" a. If in Engineer's sole discretion an item of <br /> . material or equipment proposed by <br /> A. Whenever an item of material or equip- Contractor does not qualify as an "or-equal" <br /> ment is specified or described in the Contract Docu- item under Paragraph 6.05.A.1, it will be <br /> I ments by using the name of a proprietary item or the considered a proposed substitute item. <br /> name of a particular Supplier, the specification or <br /> description is intended to establish the type, func- b. Contractor shall submit sufficient informa- <br /> tion, appearance, and quality required. Unless the Lion as provided below to allow Engineer to <br /> I specification or description contains or is followed by determine that the item of material or <br /> words reading that no like, equivalent, or "or-equal" equipment proposed is essentially equiva- <br /> item or no substitution is permitted, other items of lent to that named and an acceptable <br /> 1 material or equipment or material or equipment of substitute therefor. Requests for review of <br /> proposed substitute items of material or <br /> EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright 02002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 00700- 19 <br /> 04/08 Final Version 054893 <br />