My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specifications
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(08-06-01) Atlantic Isle Roadway and Utility Improvements
>
Specifications
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2013 5:26:14 PM
Creation date
3/21/2013 5:25:32 PM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
235
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> equipment will not be accepted by Engineer b) available engineering, sales, <br /> from anyone other than Contractor. maintenance, repair, and <br /> I <br /> replacement services; <br /> c. The requirements for review by Engineer <br /> will be as set forth in Paragraph 6.05.A.2.d, 4) and shall contain an itemized <br /> I as supplemented in the General <br /> Requirements and as Engineer may decide estimate of all costs or credits that will result <br /> directly or indirectly from use of such <br /> is appropriate under the circumstances. substitute item, including costs of redesign <br /> and claims of other contractors affected by <br /> I d. Contractor shall make written application any resulting change, <br /> to Engineer for review of a proposed <br /> substitute item of material or equipment that B. Substitute Construction Methods or <br /> I Contractor seeks to furnish or use. The <br /> application: Procedures: If a specific means, method, technique, <br /> sequence, or procedure of construction is expressly <br /> required by the Contract Documents, Contractor <br /> 1) shall certify that the proposed may furnish or utilize a substitute means, method, <br /> I substitute item will: technique, sequence, or procedure of construction <br /> approved by Engineer. Contractor shall submit <br /> a) perform adequately the functions sufficient information to allow Engineer, in <br /> I and achieve the results called for by <br /> the general design, Engineer's sole discretion, to determine that the <br /> substitute proposed is equivalent to that expressly <br /> called for by the Contract Documents. The <br /> b) be similar in substance to that requirements for review by Engineer will be similar to <br /> Ispecified, and those provided in Paragraph 6.05.A.2. <br /> c) be suited to the same use as that C. Engineer's Evaluation: Engineer will be <br /> I specified; allowed a reasonable time within which to evaluate <br /> each proposal or submittal made pursuant to <br /> 2)will state: Paragraphs 6.05.A and 6.05.8. Engineer may <br /> require Contractor to furnish additional data about <br /> I a) the extent, if any, to which the the proposed substitute item. Engineer will be the <br /> use of the proposed substitute item sole judge of acceptability. No "or equal" or <br /> will prejudice Contractor's substitute will be ordered, installed or utilized until <br /> I achievement of Substantial Comple- <br /> tion Engineer's review is complete, which will be <br /> on time; evidenced by either a Change Order for a substitute <br /> or an approved Shop Drawing for an "or equal." <br /> b) whether or not use of the Engineer will advise Contractor in writing of any <br /> I proposed substitute item in the negative determination. <br /> Work will require a change in any of <br /> the Contract Documents (or in the D. Special Guarantee: Owner may require <br /> I provisions of any other direct Contractor to furnish at Contractor's expense a <br /> contract with Owner for other work special performance guarantee or other surety with <br /> on the Project) to adapt the design respect to any substitute. <br /> to the proposed substitute item; and <br /> I E. Engineer's Cost Reimbursement <br /> c) whether or not incorporation or Engineer will record Engineer's costs in evaluating a <br /> use of the proposed substitute item substitute proposed or submitted by Contractor <br /> I in connection with the Work is sub- pursuant to Paragraphs 6.05.A.2 and 6.05.B <br /> sub- <br /> ject to payment of any license fee or Whether or not Engineer approves a substitute item <br /> royalty; so proposed or submitted by Contractor, Contractor <br /> shall reimburse Owner for the charges of Engineer <br /> I 3)will identify: for evaluating each such proposed substitute. <br /> Contractor shall also reimburse Owner for the <br /> a) all variations of the proposed charges of Engineer for making changes in the <br /> I substitute item from that specified , <br /> and Contract Documents (or in the provisions of any <br /> other direct contract with Owner) resulting from the <br /> acceptance of each proposed substitute. <br /> 1 EJCDC C-700 Standard General Conditions of the Construction Contract. <br /> Copyright 17 2002 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> 1 00700.20 <br /> 04/08 Final Version 05-4893 <br />
The URL can be used to link to this page
Your browser does not support the video tag.